My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ENFORCE21009
DRMS
>
Back File Migration
>
Enforcement
>
ENFORCE21009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:31:17 PM
Creation date
11/21/2007 9:53:13 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982056
IBM Index Class Name
Enforcement
Doc Date
2/8/2000
Doc Name
EXHIBIT 14 HYDROLOGIC MONITORING PLAN FOIDEL CREEK LIFE OF MINE PERMIT
Violation No.
CV2001004
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TABLE A'(continued) ~ <br />HYDROLOGIC MONITORING SITES <br />SURFACE FLOW <br /> MONI TORING FREQUENCY <br /> <br /> <br />SITE trl WATER LEVEL <br />8 FIELD <br />PARAMETERS WATER LEVEL <br />8 <br />ELECTRICAL COND. WATER <br />QUALITY <br />SAMPLING SULFATE <br />R <br />FIELD EC <br /> <br />COMMENTS <br />Foldel:Creek3: 1 <br />USGS 09243800 Monthl Quarterl 1 <br />8 Monthl Quarterl 1 <br />14 Monthl Quarterl 1 <br />304 Monthl Quarterl 1 Flow onl <br />USGS 09243900 Monthl Quarterl 1 <br /> <br />16 Monthl Weekl 4 Quarterl 1 , to be re laced b 16A in 2000 <br />16A Monlhl Weekl 4 Quarterl 1 <br />302 Monthl Quarterl Durin irri anon season onl 2 Jun-Se <br />1002 Monthl Quarterl 1 <br />27A Monthl Quarterl 1 <br />1003 Monthl Quarterl 1 <br /> Weekl 4 Monlhl 4 <br />307 Monthl /Semi Annuall ----- 3 Flow onl /Fields twice a ear <br />305 Monthl /Semi Annuall ------ 3 Flow onl /Fields twice a ear <br /> <br />301 Monthl Quarterl <br /> Weekl 4 Monthl 4 <br />69 Monlhl Quarterl <br /> Weekl 4 Monthl 4 <br />1005 Monthl Quarterl <br /> Weekl 4 Monthl 4 <br />Mlddte Creek'q."~""~'". <br />MC-1 Monthl Quarterl 1 <br />USGS 09243700 Monthl Quarterl 1 <br />29 Monthl Quarterl 1 <br /> Weekl 4 Monlhl 4 <br />TR 00-35 <br />NOTE: t~l Sampling will be performed on a flexible schedule throughout normal Ilow period, March <br />through September. Within this time frame, flow and lield parameters will be measured <br />twelve (12) times and four (4) full suite analyses will be conducted. <br />"~ First headgate of irrigation ditch downstream of mine discharge. Monitoring to begin <br />once Fish Creek Dewatering Facility is functioning. <br />t't Monthly measurements collected during ice free months, typically late Mar/Apr thru Sept. <br />t°t Only when either sites 109 or 115, or both are discharging <br />Ex. 14-8 <br />A~'~RflVED APR 1 4 2000 <br />4/11/00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.