Laserfiche WebLink
<br />r. ; .;,~ <br />List of Stipulations Resulting from this Permit Revision Approval: <br />Stipulation No. 11 <br />PRIOR TO APPROVAL OF ANY MINING RELATED ACTIVITIES WHICH WOULD <br />POTENTIALLY AFFECT LANDS IN THE NORTH 1/2 OF SECTION 10, T5N, R86W OR THE <br />SOUTHWEST 1/4 OF THE SOUTHWEST 1/4 OF SECTION 33, T6N, R86W (THROUGH <br />FUTURE PERMIT REVISION OR RENEWAL) THE PERMITTEE WILL SUBMIT ACCEPTABLE <br />RIGHT OF ENTRY INFORMATION TO THE DIVISION. <br />Stipulation No. 12 <br />THE PERMITTEE WILL SUBMIT A REVISED EXHIBIT 14 WITHIN 30 DAYS OF PERMIT <br />ISSUANCE WHICH INCLUDES MONITORING OF FOUR WADGE OVERBURDEN WELLS: <br />006-81-31, 006-82-48, 009-79-4 AND 006-82-74. IN THIS PLAN THE PERMITTEE <br />WILL COMMIT TO QUARTERLY SUBMISSION OF MONITORING DATA, AND THE SUBMITTAL <br />OF AN ANNUAL HYDROLOGIC REPORT (AHR) WHICH INTERPRETS THE PREVIOUS YEAR'S <br />DATA AND LONG TERM TRENDS ON OR BEFORE FEBRUARY 28 OF EVERY YEAR. <br />Stipulation No. 13 <br />THE PERMITTEE WILL PLACE STAFF <br />ADJACENT TO ALLUVIAL WELLS ON <br />PRIOR TO SAMPLING ON AN ANNUAL <br />WELL WILL INCLUDE RECORDING OF <br />Stipulation No. 14 <br />GAGES OR SIMILAR MEASURING DEVICES <br />FISH CREEK AND SURVEY THEM IN EVERY JULY <br />BASIS. MONTHLY MONITORING OF THE ALLUVIAL <br />THE STREAMS ELEVATION WITH THE STREAM GAGE. <br />WITHIN ONE MONTH OF PERMIT ISSUANCE, THE PERMITTEE WILL SUBMIT AN <br />ACCEPTABLE STANDARD FOR SPECIES DIVERSITY, TO BE USED IN DETERMINATIONS <br />OF REVEGETATION SUCCESS FOR AREAS RECLAIMED TO PASTURELAND. <br />Stipulation No. 15 <br />THE PERMITTEE WILL SUBMIT MODIFIED DRAINAGE DESIGNS FOR THE FISH CREEK <br />BOP.EHOLE SHAFT AT LEAST THREE (3) MONTHS PRIOR TC CONSTRUCTION OF THE <br />FACILITY. THE DESIGNS MUST BE APPROVED BY ML RD IN WRITING PRIOR TO ANY <br />CONSTRUCTION ACTIVITIES AT THE SITE. <br />Stipulation No. 16 <br />WITHIN 30 DAYS OF PERMIT ISSUANCE, THE PERMITTEE WILL SUBMIT A NEW MAP OR <br />REVISE THE MINE PLAN MAP (MAP 23) TO SHOW THE LOCATION OF EXISTING AND <br />PROPOSED SUBSIDENCE MONUMENTS. <br />Stipulation No. 17 <br />THE PERMITTEE WILL DEVELOP EITHER AN APPROPRIATE ROAD CONTROL PLAN FOR <br />ROADS WITHIN THE PROJECTED AREA OF SUBSIDENCE, INCLUDING PHYSICAL CONTROL <br />OF ACCESS THROUGH THE USE OF A GATE OR CHAIN, OR AN APPROPRIATE DIRT ROAD <br />INSPECTION, BARRICADE AND REPAIR PLAN. THIS PLAN SHALL BE SUBMITTED IN <br />ACCEPTABLE FORM, WITHIN 30 DAYS OF PERMIT ISSUANCE. <br />1763G <br />