Laserfiche WebLink
s <br />Small Dumps <br />Reclamation Cost <br />Area: Tornado/Raven Dump <br />• <br />7.3 Acres <br />Recontouring: <br />Fertilize: <br />Rip: <br />Soil Analysis: <br />Seeding: Slope <br />Draging: Slope <br />Hydromulching: <br />Trees & Shrubs: <br />Production Rates <br />---------------- <br />CY/Hr. Acres/Hr. <br />677 - <br />- 1.5 <br />- 1.0 <br />- 4.0 # <br />- 1.0 <br />- 2.5 <br />- 0.6 <br />- 0.5 <br /> Prod. Labor <br /> Equip. <br />------------- Number <br />---- <br />- Units <br />-- <br />-- Rate Hours Cost <br /> <br />Recontouring: <br />D9N - <br />--- <br />1.0 ---- <br />8800 --------- <br />677 --------- <br />13 -------- <br />21.14 <br />Fertilize: D8N 1.0 3 1.5 2 21.14 <br />Rip: D9N 1.0 3 1.0 3 21.14 <br />Soil Analysis: - - 3 4.0 - 0.00 <br />Seeding: Slope Hand 3.0 3 3.0 1 15.87 <br />Draging: Slope D8N w/chain 1.0 3 2.5 1 21.14 <br />Hydramulch: Hydromulcher 1.0 3 0.6 5 49.57 <br /> Trees & Shru 3.0 3 1.5 2 15.87 <br />Forman Pickup 1.0 - - 25 26.86 <br /># samples/acre <br />• <br />Cost/Unit Volumes di Areas <br />S/Acre CY Acres <br />- 8800 - <br />162.11 - 3.0 <br />132.81 3.0 <br />80.00 - 3.0 <br />302.86 - 3.0 <br />52.00 - 3.0 <br />551.23 - 3.0 <br />156.74 - 3.0 <br />Equip. Material Hourly Total <br />Cost Cost Cost Cost <br />111.67 0.00 132.81 1727 <br />117.66 104.36 243.16 486 <br />111.67 0.00 132.81 398 <br />0.00 20.00 20.00 240 <br />0.00 289.99 305,.$6 918 <br />108.86 0.00 130.8p 130 <br />31.83 249.34 330.74.. 1654 <br />0.00 166.00 181.87 1091 <br />8.42 0.00 35.28 882 <br />Total Cost 7526 <br />w <br />ao <br />