Laserfiche WebLink
• • ! <br />small Dunps <br />Reclamation Cost <br />Area: Joe Dandy Dui 6.8 Acres <br /> Production Rates CostNnit Volumes & Areas <br />- <br /> ------- <br />CY/Hr. --------- <br />Acres/llr. --------- <br />S/Acre ------- <br />CY ------ <br />- <br />Acres <br /> Recontouring: 677 - - 1600 - <br /> Fertilize: - 1.5 162.11 - 3.4 <br /> Rip: - 1.0 132.81 _ 3.4 <br /> Soil Analysis: - 4.0 # 60.00 _ 3.4 <br /> Seeding: Slope - 1.0 302.86 - 3.4 <br /> Draging: Slope - 2.5 52.00 - 3.4 <br /> F~ydromulching - 0.6 551.23 - 3.4 <br /> Trees & Shrubs: - 0.5 156.74 - 3.4 <br /> Prod. Labor Equip. Material Hourly Total <br /> Equip. <br />- <br />- Number Units <br />- Rate Hours Cost Cost Cost <br />- Cost Cost <br /> <br />Recontouring: -- <br />---- <br />--- <br />D9N - <br />----------------- <br />1.0 1600 -------- <br />67T ----------- <br />2 -------- <br />21.14 ---------- <br />111.67 --- <br />---- <br />0.00 ---------- <br />132.81 ------- <br />266 <br />Fertilize: D8N 1.0 3.4 1.5 2 21.14 117.66 104.36 243.16 486 <br />Rip: D9N 1.0 3.4 1.0 3 21.14 111.67 0.00 132.81 398 <br />Soil Analysis: - - 3.4 4.0 - 0.00 0.00 20.00 20.00 272 <br />Seeding: Slope Nand 3.0 3.4 3.0 1 15.87 0.00 286.99 302.86 909 <br />Draging: Slope DBN w/chain 1.0 3.4 2.5 1 21.14 108.86 0.00 130.00 130 <br />Hydraaulch: Hydramulcher 1.0 3.4 0.6 6 49.57 31.83 249.34 330.74 1984 <br />Trees do Shrubs: - 3.0 3.4 1.5 2 15.87 0.00 166.00 181.87 1091 <br />For®ati Pickup 1.0 - - 15 26.86 8.42 0.00 35.28 529 <br />Total Cost 6066 <br />w <br />3': <br />