My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV08380
DRMS
>
Back File Migration
>
Revision
>
REV08380
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 1:09:00 AM
Creation date
11/21/2007 9:52:49 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Revision
Doc Date
5/1/1995
Doc Name
APPENDIX D RECLAMATION & BONDING
Type & Sequence
AM6
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
66
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Cresson Project <br />Reclamation Cost <br />Area: Cresson Pit <br />Drop Bench: @ <br />Fertilize: <br />Rip: <br />Heul Topsoil: <br />Spread Topsoil: <br />Soil Analysis: <br />Seeding: Flat <br />Draging: Flat <br />Hydromilch: <br />Trees & Shrubs: <br />Fencing: • <br />Foreman <br /> <br /> <br /> Production Rates CostNnit Volumes & Areas <br /> -------- <br />CY/llr. -------- <br />Acres/Hr. --------- <br />S/Acre ------- <br />CY -------- <br />Acres <br /> Drop Bench: @ - - - 14400 ft - <br /> Fertilize: - 1.5 162.11 - 125.7 <br /> Rip: - 1.0 132.81 _ 125.7 <br /> Hauling Topsoil: <br /> Truck # - - 134600 - <br /> Spread Topsoil: 830 - - 134600 - <br /> Soil Analysis: - 4.0 sampjacre 80.00 - 125.7 <br /> Seeding: Flat - 2.8 336.56 - 125.7 <br /> Draging: Flat - 3.8 34.88 - 125.7 <br /> 1Lydromulchirg - 0.6 551.23 - 125.7 <br /> Trees d Shrubs: - 0.5 156.74 - 125,7 <br /> Fencing: s - - - 14400 ft - <br /> Prod. Labor Equip. Material Hourly Total <br />Equip. Number Units Rate Hours Cost Cost Cost Cost Cost <br />- - 14400 - - 0.00 0.00 0.00 20.30 292320 <br />D8N 1.0 125.7 1.5 84 21.14 117.66 104.36 243.16 20425 <br />D9N 1.0 125.7 1.0 126 21.14 111.67 0.00 132.81 16734 <br />773B - 134600 # 345 17.83 106.95 0.00 124.78 114769 <br />988B 1.0 - - 345 20.26 109.60 0.00 129.86 44802 <br />14G Grader 1.0 - - 173 20.42 63.12 0.00 83.54 14452 <br />Water Trk. 1.0 - - 173 17.59 95.18 0.00 112.77 19509 <br />D9N 1.0 134600 830 162 21.14 111.67 0.00 132.81 21515 <br /> 125.7 4.0 - 0.00 0.00 20.00 20.00 10056 <br />D8N whopper 1.0 125.7 2.8 45 21.14 117.66 803.57 942.37 42407 <br />I?SN w/harrow 1.0 125.7 3.8 33 21.14 111.41 0.00 132.55 4374 <br />Hydromulcher 1.0 125.7 0.6 210 49.57 31.83 249.34 330.74 69455 <br />- 3.0 125.7 1.5 84 15.87 0.00 166.00 181.87 45831 <br />- - 14400 - - 2.65 1.75 8.75 13.15 189360 <br />Pickup 1.0 - - 1005 26.86 8.42 0.00 35.28 35456 <br />- Cost/linear Poot, R.C. Means, Site Work do Landscape Cost Data, 1994, pg. 86. <br />@ Contractor quote. <br /># See Haulade Detail Sheet <br />Total Cost 941467 <br />a <br />
The URL can be used to link to this page
Your browser does not support the video tag.