Laserfiche WebLink
i <br />• Cresson Pro)ect <br />Reclamation Cost <br />Area: Plant <br />D®oolition do Di sposal <br /> Ave. a <br />Building <br />--------------------- Length <br />-------- Width <br />-------- Height <br />-------- Cu.Ft. <br />--------- S/Cu.Ft. <br />----------- Cost <br />------- <br />Primary Crusher 52.5 32.0 68.0 114240 0.16 18278 <br />Secondary Crusher 116 30.0 70.0 243600 0.16 38976 <br />Conveyor S/Ft <br />Primary - Secondary 300.0 11.50 3450 <br />Secondary - Heap 3100.0 11.50 35650 <br />Processing Plant S/Cu.Ft. <br />Building 200,0 100.0 51.5 1030000 0.16 164800 <br />Carbon Striping 6c <br />Regen. Equip. 107.0 25.0 45.0 120375 0.16 19260 <br /> Number Diameter Height <br />Carbon Columns <br />------------ 10 10.0 11.0 8635 0.16 1382 <br />-- <br />-- <br />--------- ------- --------- -------- ------------------- <br />Total D®olition - <br />-- <br />281796 <br />• R.S. Means <br /> <br />• <br />