Laserfiche WebLink
5.8.1 General <br />• 5.8.2 Haul Roads <br />5.8.3 Access Roads <br />6.0 Valley Leach Facility -Use of Existing Valley Leach Facility <br />7.0 Processing and Gold Recovery-Use of Existing Precious Metals Recovery Facility <br />8.0 Support Facilities-Use of Existing Support Facilities <br />8.1 Maintenance <br />8.2 Power <br />8.3 Water Supply <br />8.4 Security and Signs <br />8.S Sanitary Services <br />8.6 Public Utilities <br />9.0 Surface Water Management <br />9.1 General <br />9.2 Drainage Analysis and Design <br />9.3 Sediment Control <br />• 10.0 Monitoring <br />10.1 Surface Water <br />10.2 Ground Water <br />10.3 VLF-Monitoring <br />10.4 Blast seismic Monitoring <br />10.5 Atr Quality Monitoring <br />11.0 Reclamation and Closure <br />11.1 Reclamation Objectives <br />11.2 Plant Growth Materials <br />11.3 General Reclamation Procedures <br />11.3.1.1 Grading and Ripping <br />11.3.1.2 Soil Replacement <br />11.3.1.3 Revegetation <br />11.3.1.4 Monitoring/Erosion Control <br />11.4 ECME Reclamation <br />12.0 Reclamation Costs and Financial Warranty <br />ii <br />