My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV08273
DRMS
>
Back File Migration
>
Revision
>
REV08273
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 1:08:55 AM
Creation date
11/21/2007 9:51:46 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981026
IBM Index Class Name
Revision
Doc Date
10/21/1991
Doc Name
ADJUDICATORY HEARING CANADIAN STRIP MINE PHASE II BOND RELEASE FN C-81-026
From
MLRD
To
OSM
Type & Sequence
SL1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STATE OF COLORADO <br />MINED LAND RECLAMATION DIVISION <br />Department of Natural Resources <br />1313 Sherman SI., Room 215 <br />Denver, CO 80203 <br />303 866-3567 <br />FAx~ 303 8328106 <br />October Zl, 1991 <br />Mrs. Ida Murphy <br />713 Coronado <br />Fort Collins, Colorado 80526 <br />RE: Adjudicatory Hearing, Canadian Strip Mine, <br />Phase II Bond Release, File No. C-81-026 <br />Dear Mrs. Murphy: <br />04 <o~ <br />ti~ _q> <br />Nr.: <br />n <br />a8 r~++ <br />• ~ <br />~ye~6 <br />Roy Romer. <br />Governor <br />Freo R. Banta. <br />Division Director <br />The Colorado Mined Land Reclamation Board will hold an adjudicatory hearing <br />on the Division's proposed decision to release bond at Canadian Strip Mine <br />during the Board meeting on November 13 and 14, 1991. The operator, Wyoming <br />Fuels, is contesting the Division's interpretation of the regulations in <br />accordance with Rule 3.03.2(6). Specifically, the company is concerned that <br />the Division's decision was based on a guideline requiring the vegetative <br />cover to be 907, of the reference area with 90`r statistical accuracy. A copy <br />of the public notice associated with the Division's decision is enclosed for <br />your review. <br />The hearing had been scheduled for October but was continued until November <br />at Wyoming Fuels' request. Please tail if you have any questions. <br />Sincerely, <br />C r1 Begej <br />Reclam ion Specialist <br />CWB/eke <br />8434E <br />
The URL can be used to link to this page
Your browser does not support the video tag.