My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV08210
DRMS
>
Back File Migration
>
Revision
>
REV08210
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 1:08:53 AM
Creation date
11/21/2007 9:51:30 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019
IBM Index Class Name
Revision
Doc Date
12/6/2006
Doc Name
3rd Adequacy Review Letter
From
DRMS
To
Colowyo Coal Company L.P.
Type & Sequence
TR63
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
additional questions (questions 16-20) based on these responses. These <br />questions are listed below. <br />6. Response accepted. The engineering designs and SEDCAD modeling were <br />submitted with Colowyo's 25 July 2006 responses. The Division has <br />additional questions (questions 16-20) based on these responses. These <br />questions are listed below. <br />7. Response accepted. The engineering designs and SEDCAD modeling were <br />submitted with Colowyo's 25 July 2006 responses. The Division has <br />additional questions (questions 16-20) based on these responses. These <br />questions aze listed below. <br />8. Response accepted. This was addressed with Colowyo's 8 May 2006 <br />responses. <br />9. Response accepted. This was addressed with Colowyo's 8 May 2006 <br />responses. <br />10. Response accepted. The engineering designs and SEDCAD modeling were <br />submitted with Colowyo's 25 July 2006 responses. The Division has <br />additional questions (questions 16-20) based on these responses. These <br />questions are listed below. <br />11. Response accepted. This was addressed with Colowyo's 8 May 2006 <br /> responses. <br />12. Response accepted. This was addressed with Colowyo's 8 May 2006 <br /> responses. <br />13. Response accepted. This was addressed with Colowyo's 8 May 2006 <br /> responses. <br />14. Response accepted. This was addressed with Colowyo's 8 May 2006 <br /> responses. <br />I5. Response accepted. Colowyo has submitted the updated Map 18 as requested. <br />The following are the new questions based on Colowyo's responses to adequacy question <br />5, 6, 7 and 10. <br />16. The Division did not find a channel profile for the North Tributary of East Pit <br />Ditch in the response package. Please submit for incorporation into the <br />permit the channel profile for the North Tributary of the East Pit Ditch. <br />Colowyo TR-63 6 December 2006 <br />Third Adequacy Review Page 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.