My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV08202
DRMS
>
Back File Migration
>
Revision
>
REV08202
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 1:08:52 AM
Creation date
11/21/2007 9:51:28 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980006
IBM Index Class Name
Revision
Doc Date
1/19/1999
Doc Name
MARR MINE PN C-80-006 PROPOSED DECISION TR-18 RELOCATE TIPPLE DEMOLITION DEBRIS
From
DMG
To
MONTGOMERY WATSON
Type & Sequence
TR18
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> ^III IIIIIIIIIIIIIIII <br />999 <br />STATE OF COLORADO <br />DIVISION OF MINERALS AND GEOLOGY <br />Drpanmrnl ul Natural Resources <br />1 11 1 Shermun SL, Ruom '_ 15 <br /> <br />Denver, Colorado BUZU} I~~~~~ <br />Phone UUl1 U66-}567 <br /> <br /> DEPARTMENT OF <br /> I E <br />E <br />T <br />January l9, 1999 OUR <br />R <br />S <br />S <br /> <br />Jerry Nettleton Rov Remer <br />ernernnr <br />Montgomery Watson leme. s. Locnhea,l <br />P.O. BOX 774018 Execnuve Duecux <br /> <br />Steamboat Springs, CO 80477 m¢hael B Lnnl; <br />D~.,~an~ D~~eclnr <br />Re: blarr l~line (Permit No. C-80-006) <br />Proposed Decision -Technical Revision No. 18 (TR-18) <br />Relocate Tipple Demolition Debris <br />Dear Mr. Nettleton: <br />Enclosed you will find the Division of Minerals and Geology's Proposed Decision for Technical Revision <br />No. 18 at the Marr Mine. Reclamation of the tipple is to be completed in the 1999 field season as stated <br />in your December 15, 1998 regarding TR-19. Notice of the proposed decision will be published in the <br />Jackson Courlry Star as soon as possible. The first publication will initiate the ten (l0) day public <br />comment period for the Division's decision. <br />Documentation must be submitted to the Division demonstrating that a copy of the approved revision <br />application was sent to the Office of Surface Mining and the Bureau of Land Management. The material <br />should be sent within 1 ~ days of final approval. <br />Please refer to the Performance Bond heading on the enclosed proposed decision form. If the amount of <br />Bond Held equals or exceeds the Revised Liability, you need not submit additional bond. However, if the <br />Revised Liability exceeds the Bond Held, please submit additional bond or rider to your existing bond <br />that equals or exceeds the Revised Liability. The revision will not be final until the bond is approved by <br />the Division. <br />If you have any questions, please contact me. <br />Sincerely, <br />Sandra L. Brown <br />Environmental Protection Specialist <br />Enclosure <br />cc: Lawrence Kline, Office of Surface Mining, with enclosure <br />George Patterson with enclosure <br />A11oss\~ rc\mmp\CTR U60U6.S B I <br />
The URL can be used to link to this page
Your browser does not support the video tag.