My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV08165
DRMS
>
Back File Migration
>
Revision
>
REV08165
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 1:08:50 AM
Creation date
11/21/2007 9:51:12 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981041
IBM Index Class Name
Revision
Doc Date
12/30/1994
Doc Name
APPLICATION FOR A TR SCREENING AND CRUSHING PLANT INSTALLATION
From
POWDERHORN COAL CO
To
DMG
Type & Sequence
TR21
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
POWDERHORN <br />COAL COMPANY <br />December 28, 1994 <br />iii iiiiiiiiiiiiiiii <br />999 <br />P.O. Box 1430 <br />Palisatle, Coloratlo 61526 <br />(303) 464-7951 <br />Fa: (303)d6d-7167 <br />RFCEI~/F_D <br />Erica S. Crosby <br />Division of Mineral & Geology <br />1313 Sherman St., Room 215 <br />Denver, CO 80203 <br />Re: Application for a Technical Revision <br />Screening and Crushing Plant Installation <br />Permit C-81-041 <br />Dear Ms. Crosby: <br />DEC 3 0 1994 <br />Division of Minerals & Geology <br />PCC is in the process of upgrading its coal handling facilities <br />at the Roadside North Portal surface facilities. Because of some <br />provisions in a new coal sales agreement, it is necessary to <br />screen the coal at the Nortli Portal surface facilities. PCC <br />plans to construct a screening and crushing facility <br />approximately at the location of tY1e existing truck loadout bin. <br />The existing truck loadout bin and a new truck loadout bin will <br />be located approximately 120 feet east of the new screening and <br />crushing facility. Two 36" wide truss mounted conveyors will be <br />utilized to convey the screened and crushed coal into the <br />separate truck loadout bins. <br />Another item PCC plans to construct is a gob handling conveyor. <br />This conveyor will be utilized when it is necessary to convey gob <br />from the mine. The gob conveyor will transport gob from the <br />first transfer outby the North Portal to the coal pad. <br />Enclosed is an application for a technical revision to provide <br />for the construction of a gob conveyor, screening and crushing <br />plant, an additional truck loadout bin and two 36" conveyors. <br />Revised pages 138, 144, 144a and 147, revised Exhibit 8A and a <br />reclamation cost estimate comprise this technical revision <br />application. <br />Please call if you have any questions. <br />Sincerely, <br />,~ Larry M. Reschke, P.E. <br />Engineer <br />
The URL can be used to link to this page
Your browser does not support the video tag.