Laserfiche WebLink
POWDERHORN <br />COAL COMPANY <br />December 28, 1994 <br />iii iiiiiiiiiiiiiiii <br />999 <br />P.O. Box 1430 <br />Palisatle, Coloratlo 61526 <br />(303) 464-7951 <br />Fa: (303)d6d-7167 <br />RFCEI~/F_D <br />Erica S. Crosby <br />Division of Mineral & Geology <br />1313 Sherman St., Room 215 <br />Denver, CO 80203 <br />Re: Application for a Technical Revision <br />Screening and Crushing Plant Installation <br />Permit C-81-041 <br />Dear Ms. Crosby: <br />DEC 3 0 1994 <br />Division of Minerals & Geology <br />PCC is in the process of upgrading its coal handling facilities <br />at the Roadside North Portal surface facilities. Because of some <br />provisions in a new coal sales agreement, it is necessary to <br />screen the coal at the Nortli Portal surface facilities. PCC <br />plans to construct a screening and crushing facility <br />approximately at the location of tY1e existing truck loadout bin. <br />The existing truck loadout bin and a new truck loadout bin will <br />be located approximately 120 feet east of the new screening and <br />crushing facility. Two 36" wide truss mounted conveyors will be <br />utilized to convey the screened and crushed coal into the <br />separate truck loadout bins. <br />Another item PCC plans to construct is a gob handling conveyor. <br />This conveyor will be utilized when it is necessary to convey gob <br />from the mine. The gob conveyor will transport gob from the <br />first transfer outby the North Portal to the coal pad. <br />Enclosed is an application for a technical revision to provide <br />for the construction of a gob conveyor, screening and crushing <br />plant, an additional truck loadout bin and two 36" conveyors. <br />Revised pages 138, 144, 144a and 147, revised Exhibit 8A and a <br />reclamation cost estimate comprise this technical revision <br />application. <br />Please call if you have any questions. <br />Sincerely, <br />,~ Larry M. Reschke, P.E. <br />Engineer <br />