My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV08133
DRMS
>
Back File Migration
>
Revision
>
REV08133
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 1:08:49 AM
Creation date
11/21/2007 9:51:05 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981033
IBM Index Class Name
Revision
Doc Date
4/2/1999
Doc Name
BEAR MINE PN C-81-033 TR APPLICATION 27
From
DMG
To
DELTA CNTY INDEPENDENT
Type & Sequence
TR27
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />NOTICE OF PROPOSED DECISION <br />The Colorado Division of Minerals and Geology proposes to approve Technical Revision Application <br />No. 27 (TR-27) for the Bear Ivfine (Permit No. C-81-033), submitted by Bear Coal Company, Inc. The <br />operator proposes to construct a shallow mine-water treatment pond in the old truck turn-around area. <br />The Bear Mine is an underground coal mine located in Gunnison County, located near the [own of <br />Somerset, Colorado. Coal interest is federal, and the surface affected is federal and private land. The <br />permit area encompasses approximately 1.894.0 acres. <br />This proposed decision is based on a finding that the proposed operation will comply with all <br />requirements of the Colorado Surface Coal Mining Reclamation Act, Section 34-33-101, et seq., C.R.S., <br />and the regulations promulgated thereunder. <br />Copies of the proposed decision, including stipulations, are on file for public inspection at the Colorado <br />Division of Minerals and Geology, Room 215, Centennial Building, 1313 Sherman Street, Denver, <br />Colorado 80203. Persons with an interest that may be adversely affected by the proposed decision may <br />request a formal hearing before the Mined Land Reclamation Board on the proposed decision. Such <br />request must be made within ten (10) days of the initial publication of this notice, must be in writing, <br />and must state with reasonable specificity the reasons for the request and the objections to the proposed <br />decision. <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.