Laserfiche WebLink
E-8 <br />• E.4.9 Contingency Plans <br />Due to topographic conditions at the proposed plant site, flooding cannot <br />occur. Consequently, no contingency plans for flooding are offered. Since <br />the proposed mining plan involves solution mining, no massive slope failure <br />will occur. Also, explosives will not be used on-site, with the exception <br />of possibly one or two small charges associated with formation fracturing. <br />Consequently, no contingency plans for protection of environmental or public <br />welfare are offered. <br />Fire protection will be afforded with a minimum of twelve 30-1b ABC all- <br />purpose fire extinguishers. The area immediately surrounding the surface <br />processing facility will be graveled and kept clear of combustible material, <br />such that any fires would be contained and kept from spreading. <br />• <br />n <br />U <br />THIS DOCUMENT CONTAINS TRADE SECRETS AND PRIVILEGED, CONFIDENTIAL AND <br />PROPRIETARY COMMIE RCIA L, FINANCIAL, GEOLOGICAL AND GEOPHYSICAL DATA A c <br />INFORMATION. PU RSUANT TO LAW,THOSE PO RTIONS MARKED"CONFIDENTIAL" ~'~~~ ~~~ of ~ .~ <br />MAY NOT BE DISCLOSED, COPIED OR MADE AVAILABLE FOR PUBLIC INSPECTION. <br />