My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV08078
DRMS
>
Back File Migration
>
Revision
>
REV08078
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 1:08:46 AM
Creation date
11/21/2007 9:50:21 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1983194
IBM Index Class Name
Revision
Doc Date
7/8/1985
Doc Name
INDUSTRIAL RESOURCES INC REGULAR MINING PERMIT MODIFICATION MLRB
From
Industrial Resources Inc.
Type & Sequence
AM1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
80
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
E-1 <br />• EXHIBIT E <br />RECLAMATION PLAN <br />E.I INTRODUCTION <br />Industrial Resources, Inc .'s (IRI's) reclamation plan involves an integrated <br />effort among engineering and environmental disciplines and is based on the <br />previous reclamation experiences of IRI, Multi Mineral Corporation, and <br />other resource development companies in the area. <br />The reclamation of the area disturbed by the proposed operation will be <br />directed toward returning the land to its current use as rangeland. The <br />reclamation plan presented below has been developed with this goal in mind. <br />It is not certain at this time whether the facilities associated with the <br />Pilot Plant will be used in whole or in part for future commercial mining <br />operations. If various Pilot Plant facilities are used for commercial <br />operations, revegetation may be delayed as outlined in Rule 6.5 of <br />the MLRD regulations. <br />The reclamation plan addresses the stabilization of the disturbed areas <br />through revegetation. Revegetation includes such topics as waste disposal <br />techniques, topsoil stockpiles, seedbed preparation, species selection, and <br />post-revegetation monitoring. Reclamation of segments of other disturbed <br />lands not within the permit area (e.g., pipeline, access roads) is an aspect <br />of the project in which the same reclamation principles apply, as described <br />herein. <br />E.2 GENERAL RECLAMATION GOALS AND PROCEDURES <br />The revegetation program is a. mitigative measure to restore disturbed areas <br />to a productive condition. Disturbed area revegetation will reduce wind and <br />water erosion and will lessen aesthetic impacts by blending these areas with <br />the vegetation of the surrounding terrain. <br />• The goal of the recl<mation program is to establish, as quickly as possible, <br />a long-standing productive cover that will essentially become an integral <br />THIS DOCUMENT COIVTAINS TRADE SECRETS AND PRIVILEGED, CONFIDENTIAL AND , <br />PROPRIETARY COMMI_RCIA L, FINANCIAL, GEOLOGICAL AND GEOPHYSICAL DATA AND ' " <br />INFORMATION. PURSUANT TO LAW,THOSE PORTIONS MARKED "CONFfDENTIAL" <br />MAY NOT BE DISCLOSED, COPIED OR MADE AVAILABLE FOR PUBLIC INSPECTION. <br />
The URL can be used to link to this page
Your browser does not support the video tag.