r~ <br />An additional 6-inch-wide by 24-inch-deep trench will contain an electrical <br />power cable to supply power to the well pump. This trench will parallel the <br />water pipeline, extending from the well to the plant site. The electrical <br />cable will be bedded in 8 inches of sand and backfilled with excavated <br />material for the balance of its depth. Figure D-6 presents a typical <br />cross-section of the powerline. <br />D.4.3 Waste Handling and Disposal <br />Waste streams for the Pilot Plant operations and their respective disposal <br />areas are presented as follows: <br />Waste Stream <br />Destination <br />. Boiler Blowdown <br />Cooling Tower Blowdown <br />Halite Bleed <br />Process Liquor Insoluble Filtration Purge <br />Potable Water Treatment Purge <br />Evaporation Pond <br />Evaporation Pond <br />Evaporation Pond <br />Evaporation Pond <br />Evaporation Pond <br />The design details and engineering standards have been previously presented <br />for the evaporation pond. After cessation of operation, solids in this pond <br />will be removed for disposal at an approved landfill. <br />D.4.4 Sanitary Facilities <br />A septic system and drainfield will be constructed to receive domestic <br />wastes. This system will be built in conformance with Rio Blanco County's <br />building codes. A11 trash and garbage generated by the Pilot Plant <br />operation will be collected in covered containers for subsequent off-site <br />. disposal at an approved landfill. <br />