Laserfiche WebLink
<br />CIRCES Cost Estimating Software <br />BULLD02ER WORK <br />PROJECT IDENTIFICATION <br /> Agency or organization name : DMG <br />Taskk: 004 Stale:Colorado PermiU1oh11:M•1980.171 <br />Dale: 11/t1/~000 County :Ou2y Abbreviation :none <br />User : WHE Sile :Bachelor-Khedive Mine Filename : M171-004 <br />Permit or otherjoh action : TR-Of mview <br />Task eescription :Finish grade for drainage conVol <br />HOURLY EQUIPMENT COST Basic machine: Cat DBN (1996) Horsepower; 2B5 <br />Blade type : Seml-Universal <br />Anachment no. 1 : ROPS Cab Shift basis : 1 per day <br />Attachment no. 2:3-shank nooer <br /> Utilization % Cost data source : (CRG) <br />Cost Breakdown : Ownership costlhour : E41.10 NA <br /> Operating cosUhour : 555.64 100 <br /> Ripper op. cost/hour: $1.73 25 <br /> Operator costlhour: 423.12 NA <br /> Total unit cosUhour : 5121.59 Total Oeet cosghour : 5121.59 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume: 1,613 LCY factor: NA volume: 1,813 LCY <br />Source o(quantiry takeaR : (fac/(43560s//acJ(1'DJ27 = 1613.3 cy <br /> <br />Source of est. swell (actor : NA <br />_ ___.. <br />_ <br />_ <br />_ <br />, .- <br />_~ <br />HOURLY PRODUCTION . .__. _ _ - _ ._ _ _ . _. _. 1 <br /> Joh Condition Correction Factors <br />Average push distance : 50 leel Source <br /> Opemtor skill: 0.75 (avg.) <br /> Malarial consistenry: 1.00 (Cat HBJ <br />Unadjusted hourly production : 11 B0 LCY/hr Dozing method : 1.00 (gen.J <br /> Visibility : 1.00 (avg.) <br />Material consistency description : Job eRcienry : O.B3 (1sh/Nday/ <br />Consolldafed stockp8e Spoil pile: 0.80 (In6rQ <br /> Push gradient: 1.00 (Cat HB) <br />Average push gradient : 0.00 % (post Altitude : 1.00 (Cat HB) <br /> Material weight: O.B7 (Ce1HBJ <br />Avenge site altitude : 8,500 leel Blade type : 1.00 (S or U) <br /> <br />Material weight : 2,650 Ibs/LCY Net correction : 0.43 <br />Material weight description <br />Decomposed rocN-25%ROCN, 75%Eadh Adjusted unit production: 509.63 LCY/hr <br /> <br /> Adjusted beet Droduclion : 509.8) LCV/hr <br />JOB TIME AND COST <br />Fleet size : 1 Dozers) Total job lime : J.17 Hours <br />Unit cost : $0.239 /LCV Total jah cost : SJ85 <br />