My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ENFORCE20670
DRMS
>
Back File Migration
>
Enforcement
>
ENFORCE20670
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:31:07 PM
Creation date
11/21/2007 9:49:44 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1988112
IBM Index Class Name
Enforcement
Doc Date
8/25/1992
Doc Name
STATUS OF 3RD PARTY SAMPLING FOR BMRIS SAN LUIS PROJECT
From
MLRD
To
BATTLE MTN GOLD FN M-88-112
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• ~II II~II~II~~I~~II~ <br />MINED LAND RECLAMATION DIVISION <br />Department of Natural Resources <br />1313 Sherman St.. Room 275 <br />Denver, CO 80203 <br />303 866-3567 <br />Fa x: 303 832-Bt06 <br />I <br />STATE OF COLORADO <br />OF'~~f0 <br />A6~B~ <br />H`r~ <br />T <br />.;` : i <br />re "!6 <br />DATE: august 25, 1992 <br />T0. the Battle .Mountain Gold Fi~(~eri~it <br />;~ <br />FROM: Jim Pe~dletan -~_-_'~~.~~~~~~ <br />RE. Status of "~ ird ampli~g" for BMRI's San Luis Projegt <br />Ray Ramer, <br />Gwemor <br />Michael e. Long, <br />Orvision Director <br />(1) Lettzrs of ncmination were r2c=_ivec curing the months of June land July. <br />(2> Oral interviews of sampling contractors were conducted on August 10th. <br />(3) Core Labs, Inc. ~nas selectzd as the analytical labcratory on August 12th. <br />Both labs were EPA Certified and had similar pricing schedules. <br />However, Core Labs had experience in conducting WAD cyanide analyses, <br />whereas Analytical Technologies had never completed a WAD cyanide <br />analysis. <br />(a) 6MRI's attorney >ubmitted DRAFT .4.C.U. and Contract on augustlath. <br />(ai 6MRI ane the Division will axzcute a Memo of Understandin~a, which <br />authorizes the Division to direr: the Third Party Sampler__ <br />(b) BMRI and the Third Party Sampler will execute a Contract.', <br />(5> Written prcpcsals were received on August 17th. <br />(5) RCG / Hagler, 6ai11y, Inc. was selected as the Sampler on August 24th. <br />Ann S. Maest, PhD will be the sole ~r•vestigator. Dr. Maest ilia <br />geochemi;t / nyerochemi;t with etDer`encz in geochemical projekt <br />emrironmentai assessment and aac=_r ;uality sampling. <br />(i) Findi M.O.U. :~ ContrdC' 2711; ':rare completed on .August 25tH. <br />(6) I anticipate that the Contract ~.vill be executzd by Septzmber 1St. <br />(9i 6MRI ~.vi11 submit it f'nai adeeuacy resccnses for 'R-006 (Sampling <br />Protocol) to the Div+sion, refl2ctin.g the Third ?arty Sampling. <br />(1D> The Division ,.vill approve TR-OCb when it is deemed adequate. <br />'ii) The initial third party sampling sncu~~e occur during September.. <br />
The URL can be used to link to this page
Your browser does not support the video tag.