Laserfiche WebLink
CIRCES Cost Estimating Software <br />SCRAPER-ONLY WORK <br />PROJECT IDENTIFICATION <br />Agency or organization name : DMG <br />Task # : 04a State :Colorado <br />Date : 03/01/2006 County :Rio Blanco <br />User : GRM Site :Amick Pit <br />Permit or otherjob action :CN-O7 Initial Bond Calculations - 2006 <br />Task description :p/ace topsoil on 34 acres <br />HOURLY EQUIPMENT COST <br />Model :Cat 633E Series 2 (2001) Shift basis : 1 per day <br />Cost Breakdown : Job utilization % Horsepower : 490 <br />Ownership cost/hour : $65.49 NA Weight (UST) : 56.34 <br />Operating cosUhour : $119.05 100 Gost data source : (CRC) <br />Operator cosf/hour : $24.95 NA <br />Total unit cosUhour : $209.49 Total Fleet costlhour : $418.97 <br />.- ... ... <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume: 27,507 LCY factor : NA volume: 27,507 LCY <br /> <br />Source of quantity take-off :34.1 acres X 43560/27X.5 feet depth <br />Source of estimated swell factor : NA <br /> <br />HOURLY PRODUCTION <br />Haulino Cauacitv <br />Scraper Payload (weight) Basis : Scraper Bowl (volume) Basis <br />Material weight : 2,550 pounds/LCY Stmck volume : 23.20 LCY <br />Material description : Heaped volume : 34.00 LCY <br />Earth -Dry packed Average volume : 28.60 LCY <br />Rated payload : 82,000 pounds <br />Payload capacity : 32.16 LCY Adjusted capacity : 28.80 LCY "' <br /> <br />Cvcle Time (load + haul + spread + return) : Loading time : 0.90 minutes' <br /> Maneuver and spreading time : 0.70 minutes <br />Travel time : 'loading time per pair on posh-putt motlels <br />Route Distance (feet) Grade (%) Roll. res.(%) Total res.(%) Velocity (fpm) Travel time (min.) <br />Haul : 500 2.0 5.0 7.0 977 0.58 minutes "' <br />Return : 500 -2.0 5.0 3.0 2,999 0.17 minutes " <br />"travel lime atljvs[etl for acceleration antl deceleration at loatl and dump poinFs <br />velocities are max. a[lainable per total resistance shown, not average Total cycle time 2.35 minutes <br />Job Condition Correction Factors <br />Site altitude (feet) : 6,250 Adiusted Houdy Production <br />Altitude adjustment factor : 0.96 (Cat HB) Unadjusted unit production : 730.29 LCY/Hour"" <br />Job efficiency factor : 0.83 (1 shiWtlay) Adjusted unit production : 581.89 LCYIHour <br /> Adjusted fleet production : 1,163.78 LCY/Hour <br />Net job correction factor : 0.80 "" 2 times volume on push-pull motlels <br />Permiujob # : M-1979-103 <br />Abbreviation :none <br />Filename : M103-04a <br />JOB TIME AND COST <br />Fleet size: 2 Scraper(s) Total job time: 23,64 Hours <br />Unit cost : $0.360 /LCY Total job cost : $9,903 <br />