Laserfiche WebLink
PROJECT IDENTIFICATION <br />Task # : 01a <br />Date : 03/01/2006 <br />User: GRM <br />CIRCES Cost Estimating Software <br />BULLDOZER WORK <br />State :Colorado <br />County :Rio Blanco <br />Site :Amick Pit <br />Agency or organization name : DMG <br />Permit or other job action : CN-01 Initial Bond <br />Task description :establish 3:1 <br />HOURLY EQUIPMENT COST <br />son 2:1 exisiting siop <br />Basic machine :Cat D8R Series ll - 8SU <br />Blade type :Semi-Universal <br />Attachmentno.l :ROPS Cab <br />Attachment no. 2 :3-shank ripper <br />Horsepower: 310 <br />Shift basis : 1 per day <br /> Data source : (CRG) <br /> Utilization °1° <br />Cost Breakdown : Ownership cosUhour : $53.92 NA <br />Operating cosUhour : $75.29 100 <br />Ripper op. cosUhour : $1.99 25 <br />Operator cosUhour : $32.53 NA <br />Total unit cosUhour : $163.74 Total fleet cosUhour : $163.74 <br />.. ,. - . „- . ~, ~. .: _ .:_ .c^~' a .' <br />,.. <br />,. :. _:, <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume: 7,259 LCY factor : NA volume: 7,259 LCY <br />Source of estimated volume :Reclamation Plan difference between 2:1 and 3:1 <br />Source of estimated swell factor : NA <br />HOURLY PRODUCTION Job Condition Correction Factors Source <br />Average push distance : 50 feet <br />Unadjusted hourly production : 1,400.0 LCY/hr <br />Material consistency description <br />Partly consolidated stockpile <br />Average push gradient <br />Average site altitude <br />Material weight <br />Weight description <br />Earth -Dry packed <br />30.00 % p <br />6,520 feet <br />2,550 Ibs/LCY <br />JOB TIME AND COST <br />Fleet size : 1 Dozers) <br />Unit cost : $0.148 (LCY <br />Operator skill : 0.75 <br />Material consistency : 1.10 <br />Dozing method : 1.00 <br />Visibility : 1.00 <br />Job efficiency : 0.83 <br />Spoil pile : 0.80 <br />Push gradient : 1.60 <br />Altitude : 1.00 <br />Material weight : 0.90 <br />Blade type : 1.00 <br />Net correction : 0.79 <br />Adjusted unit production : 1107.26 LCY/hr <br />Adjusted fleet production : 1,107.26 LCY/hr <br />Total job time : 6.56 Hours <br />Total job cost : $1,073 <br />Permit/job# : M-1979-103 <br />Abbreviation :none <br />Filename : M103-01 a <br />