Laserfiche WebLink
_ ; _,.~ ~ III IIIIIIIIIIIIIIII <br />DECEMBER 14, 1989 <br />TECHNICAL REVISION 4, MID-TERM REVIEW, <br />STIPULATIONS TO THE DECISION <br />Stipulation 5 <br />ROCKCASTLE COAL COMPANY SHALL SUBMIT AN ASSESSMENT OF APPROXIMATE ORIGINAL <br />CONTOUR AT PITS 5 AND 6 TO THE DIVISION WITHIN SIXTY (60) DAYS OF THE FINAL <br />DECISION TO APPROVE TECHNICAL REVISION NUMBER 4. THIS SHALL INCLUDE CERTIFIED <br />AS-BUILTS OF THE POST-MINING TOPOGRAPHY, A COMPARISON WITH PREMINING <br />TOPOGRAPHY, AND A DISCUSSION OF EROSIONAL STABILITY, COMPATIBILITY WITH THE <br />POST-IdINING LAND USE, AND INTEGRATION WITH THE LOCAL TOPOGRAPHY PER <br />RULES 4.14.2(1) AND 4.21.3(3). <br />Stipulation 6 <br />ROCKCASTLE COAL COMPANY SHALL AT A MINIMUM SUBMIT EITHER 1) ACCEPTABLE DITCH <br />CALCULATIONS FOR PITS 2 AND 3 OR 2) A COMPLETE BOND RELEASE PACKAGE FOR <br />PHASE I AND II BOND RELEASE FOR PITS 2 AND 3, WITHIN SIXTY (60) DAYS OF THE <br />FINAL DECISION TO APPROVE TECHNICAL REVISION NUMBER 4. THE BOND RELEASE <br />PACKAGE MAY ALSO INCLUDE A BOND RELEASE REQUEST FOR PITS 1, 5 AND 6. <br />Stipulation 7 <br />ROCKCASTLE COAL COMPANY SHALL INCREASE THE BOND TO $572,000 WITHIN SIXTY (60) <br />DAYS OF THE FINAL DECISION TO APPROVE TECHNICAL REVISION NUMBER 4, TO COVER <br />ANTICIPATED RECLAMATION COSTS AT THE GRASSY GAP MINE. <br />Jbdc <br />2159E <br />