My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV08007
DRMS
>
Back File Migration
>
Revision
>
REV08007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 1:08:43 AM
Creation date
11/21/2007 9:49:15 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981039
IBM Index Class Name
Revision
Doc Date
12/14/1989
Doc Name
TR 4 MIDTERM REVIEW STIPULATIONS TO THE DECISION
Type & Sequence
MT1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
_ ; _,.~ ~ III IIIIIIIIIIIIIIII <br />DECEMBER 14, 1989 <br />TECHNICAL REVISION 4, MID-TERM REVIEW, <br />STIPULATIONS TO THE DECISION <br />Stipulation 5 <br />ROCKCASTLE COAL COMPANY SHALL SUBMIT AN ASSESSMENT OF APPROXIMATE ORIGINAL <br />CONTOUR AT PITS 5 AND 6 TO THE DIVISION WITHIN SIXTY (60) DAYS OF THE FINAL <br />DECISION TO APPROVE TECHNICAL REVISION NUMBER 4. THIS SHALL INCLUDE CERTIFIED <br />AS-BUILTS OF THE POST-MINING TOPOGRAPHY, A COMPARISON WITH PREMINING <br />TOPOGRAPHY, AND A DISCUSSION OF EROSIONAL STABILITY, COMPATIBILITY WITH THE <br />POST-IdINING LAND USE, AND INTEGRATION WITH THE LOCAL TOPOGRAPHY PER <br />RULES 4.14.2(1) AND 4.21.3(3). <br />Stipulation 6 <br />ROCKCASTLE COAL COMPANY SHALL AT A MINIMUM SUBMIT EITHER 1) ACCEPTABLE DITCH <br />CALCULATIONS FOR PITS 2 AND 3 OR 2) A COMPLETE BOND RELEASE PACKAGE FOR <br />PHASE I AND II BOND RELEASE FOR PITS 2 AND 3, WITHIN SIXTY (60) DAYS OF THE <br />FINAL DECISION TO APPROVE TECHNICAL REVISION NUMBER 4. THE BOND RELEASE <br />PACKAGE MAY ALSO INCLUDE A BOND RELEASE REQUEST FOR PITS 1, 5 AND 6. <br />Stipulation 7 <br />ROCKCASTLE COAL COMPANY SHALL INCREASE THE BOND TO $572,000 WITHIN SIXTY (60) <br />DAYS OF THE FINAL DECISION TO APPROVE TECHNICAL REVISION NUMBER 4, TO COVER <br />ANTICIPATED RECLAMATION COSTS AT THE GRASSY GAP MINE. <br />Jbdc <br />2159E <br />
The URL can be used to link to this page
Your browser does not support the video tag.