My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV07949
DRMS
>
Back File Migration
>
Revision
>
REV07949
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 1:08:40 AM
Creation date
11/21/2007 9:48:50 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1994082
IBM Index Class Name
Revision
Doc Date
3/30/2007
Doc Name
Revised Page Letter
From
Seneca Coal Company
To
DRMS
Type & Sequence
TR30
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1. <br />INSERTION INSTRUCTIONS <br />YOAST MINE <br />PERMIT C-92-082 <br />TECHNICAL REVISION (TR-30) <br />Mazch 29, 2007 <br />TAB 13. Facilities, Vol. 6A <br />• Attachment 13-12, Drainage and Sediment Control Plan -replace appendix text (pages i -13-12.9A) <br />• Attachment 13-12, Drainage and Sediment Control Plan -insert Figure 13-12.3C, Yoast Mine Postmining Channel <br />Designs, (page 13-12.13A) behind page 13-12.13 <br />• Attachment 13-12, Drainage and Sediment Control Plan -insert new Appendix 13-12.A, Turf Reinforcement Ma[ <br />Design Specifications behind page 13-12.13A <br />• Attachment 13-12, Drainage and Sediment Control Plan -insert Figure 13-12.3-1C, Yoast Mine Postnvniug Channel <br />Designs, (page 13-12.3-3A) behind page 13-12.3-3 <br />• Appendix 13-12, Drainage and Sediment Control Plan, Appendix 13-12.3, Postmining Channel SEDCAD4 Results - <br />replace pages 13-12.3-104 and 13-12.3-105 (Postnaine Channel YPM-8 TRM design; 11% Slope and 32% Slope) <br />• Appendix 13-12, Drainage and Sediment Control Plan, Appendix 13-12.3, Postmining Charmel SEDCAD4 Results - <br />replace pages 13-12.3-147 and 13-12.3-148 (Postnune Channel YPM-11 TRM design; 6% Slope and 11% Slope) <br />• Appendix 13-12, Drainage and Sediment Control Plan, Appendix 13-12.3, Postmining Channel SEDCAD4 Results - <br />xeplace pages 13-12.3-180 and 13-12.3-181 (Posttnine Channel YPM-20 TRM design; 8% Slope and 30% Slope) <br />
The URL can be used to link to this page
Your browser does not support the video tag.