My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV07906
DRMS
>
Back File Migration
>
Revision
>
REV07906
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 1:08:38 AM
Creation date
11/21/2007 9:48:08 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1996060
IBM Index Class Name
Revision
Doc Date
6/26/2000
Doc Name
COST SUMMARY FORM
Type & Sequence
SO1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~ ~ <br />CIRCES Cost Estimating Software <br />BULLDOZER WORK <br /> Agency or organization name : OMG <br /> <br />Task k : 002 State :Colorado Permitlobk : M-1996-060 <br />Date : Ofi/262000 Counry :Weld Abbreviation :none <br />User: CLK Site:Firesrien Pit Filename :MO60-002 <br /> <br />Perm it or other job action : Succession of Operator <br /> <br /> task description :Grade walls around pond <br /> <br />HOURLY E QUIPMENT COST Basic machine :Cat D8N (1996) Horsepower : 295 <br /> Blade type :Angle <br /> Attachment no. 1 : ROPS Cab Shitt basis : I per day <br /> Attachment no. 2 : NA <br /> Utilization % Cost data source : (CRG) <br /> Cost Breaktlown ~ Ownership rosUhour: $35.09 NA <br /> Operating cosUhour: $55.48 100 <br /> Ripper op. cosUhour: $0.00 NA <br /> Operator cosUhour: $23.12 NA <br /> Total unit cost hour: $I13.6d Total fleet rosVhour: $227.29 <br /> <br />MATERIAL <br />Initial OUANTRIES <br />Swell <br />Loose <br />volume: 6,125 CCY factor: 1.125 volume: 9.141 LCY <br />Source of quantity take-off :Site/ Evhibir F <br />Source of est. swell faMOr: Cat Handbook <br />Average push distance : 75 leaf <br />Unadjusted hourly production : 957 LCY/hr <br />Material consisteny description <br />Compacted till or embankment <br />Average push gradient : 8.00 °a (nag) <br />Average site altitude : 4,800 feet <br />Material weight : 2.550 Ibs/LCV <br />Material weight descdption <br />Earth - Drv Hacked <br /> Source <br />Operator skill: 0.75 /avg.J <br />Material consistency: 0.90 (Cal HBJ <br />Dozing methotl: 1.00 (gen.) <br />Visibiliry: 1.00 (avg) <br />Job eNiciency: O.B3 (1shiPodal <br />Spoil pile : 0.80 (ssd-ac/ <br />Push gradient: 1.16 (Cat HBJ <br />Altitude : 1.00 (Cal HB) <br />Material weight : 0.90 (Cal HB) <br />Blade type : 0.62 (angle) <br />Net correction : 0.30 <br />Adjusted unit production : 265.62 LCV6tr <br />Adjusted fleet produmion : 571.23 LCY/hr <br />JOB TIME AND COST <br />Fleet size: 2 Dozers) Total lob time: 16.00 Hours <br />Unit cost: $0.398 /LCY Total lob cost: $3,637 <br />
The URL can be used to link to this page
Your browser does not support the video tag.