Laserfiche WebLink
IC RCE: III I~IIIIIIIIIII III • <br />sss <br />COST SUMMARY FORM <br />PROJECT IDENTIFICATION <br />Date : 26-Jun-2000 <br />User: CLK <br />Permit or job no.: M-1996-060 <br />Abbreviation : none <br />Site : Firestien Pit <br />State :Colorado <br />County :Weld <br />Filename : M060-000 <br />Agency or organization name : DMG <br />Permit or job action :Succession of Operator <br />TASK LIST (DIRECT COSTS) FORM FLEET TASK DIRECT <br />NO. TASK DESCRIPTION USED SIZE HOURS COST <br />001 -Spread Topsoil over 43.8 acres scraped 1 19.8 $22,999 <br />002 -Gratle walls around pond dozer 2 16.0 $3,637 <br />003 -Revegetate 43.8 acres revege 1 43.0 $48,671 <br />004 -Mob/Demob equipment to the site mobilize 1 2.9 $888 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />SUBTOTALS: 81.7 $76,195 <br />' mcWdes inllation factor adjustment of <br />INDIRECT COSTS <br />OVERHEAD AND PROFIT - <br />NA <br />Liability insurance <br />Performance bond <br />Job superintendent <br />Profit <br />' assume nel hours = 50% of task hours <br />PROJECT MANAGEMENT- <br />Engineering work and/or contracUbid preparation <br />Reclamation management and/or administration <br />TOTAL DIRECT COST'= $76,19$ <br />1.55 % o(direct total = $1.181 <br />1.05 % of direct total = $800 <br />40.89 hrs'...$/hr. $32.25 total = $1,319 <br />10.00 % of direct total = $7,620 <br /> TOTAL08P= $10,919 <br /> CONTRACT AMOUNT (direct. O 8 P) _ $87, 114 <br />4.25 % 01 cntr. NA total = $3,702 <br />5.00 %o(cntr. NA total= $4,356 <br />CONTINGENCY- NA' NA total= NA <br />contingencies acrounfed for at task level TOTAL INDIRECT COS7= $18,977 <br />TOTAL BOND AMOUNT (direct + indirect) = 595,172 <br />