My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV07846
DRMS
>
Back File Migration
>
Revision
>
REV07846
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 1:08:36 AM
Creation date
11/21/2007 9:47:44 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1978305
IBM Index Class Name
Revision
Doc Date
6/10/1992
Doc Name
DICKERSON GRANITE PIT MINE ID M-78-305
From
GUNNISON GRAVEL
To
MLRD
Type & Sequence
TR1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~~~ ~~ : - ~, (iii iiiiiiiiniu iii <br />G U N N I S O N G RAVE L <br />~~ I/a(a) Ap~~ <br />(ylen~iSd71- (,i <br />P. O. BOX 42 <br />GUNNISON, CO 81230 <br />(303) 641-5811 <br />(303) 641-3088 AFTER HOURS <br />June 5, 1992 <br />State of Colorado <br />Department of Natural Resources <br />Mined Land Reclamation Division <br />Attention: James Stevens <br />423 Centennial Building <br />1313 Sherman Street <br />SALLY WILCOX.OWNEF~ <br />WARREN WILCOX. MANAGER <br />~~ ~~ <br />~~~~ <br />~1 ~ 1992 <br />R /~jinad <br />erla,,,,t.n C^qd <br />~"'.7 <br />Denver, CO 80203-2273 ,,~1b~'1 <br />Dear Mr. Stevens: 1` ]~ '~ U' ` 1 <br />v JG`7",~~I11 <br />Reference: Dickerson Granite Pit, Mine ID #M-78-305 (n C ~ <br />C+~ `' n~~M~3 <br />As noted in your report dated 3/11/92, "while the intended mining and ~~~,E~~ ,1~~~~' <br />reclamation may in fact comprise more practical approaches to mining and' ~;~~~dll ~ti <br />reclaiming the property, they do not appear to conform with the plans C~' ~~~~-~~,~i~` <br />approved", therefore, we hereby request amendment of the mining and a'.`~' 1",~~ `' I~' <br />I <br />reclamation plans in our permit. r`~;'I~,µlh'~~` <br />The requested change would be to combine phases 4 and 5 into one phase ~'1`~/ <br />-- to slope from the west side to the east side of phases 4 and 5 with ~,nt~~` <br />the bottom of the slope at the level of phase 3, and eliminate the high <br />bank. This would remove a potential hazard and conform more to the <br />existing natural slope of the surrounding north-south ridge. <br />This plan would slope for final reclamation during mining operations <br />and minimize final reclamation requirements. <br />Warren 0. Wilcox <br />Enclosure <br />
The URL can be used to link to this page
Your browser does not support the video tag.