Laserfiche WebLink
• • <br />-_- <br />Should Mr. Bukovonsky, based on his physical observations, deem it <br />necessary to move more materials to acquire the recommended slopes, <br />that task will be completed in the spring, as soon as weather con- <br />ditions allow. Should he recommend a different form of slope <br />stabilization, or accept the current slopes as substantial, an ad- <br />ditional Minor Modification or Technical Revision shall be filed <br />by Cyprus orchard Valley to the Division within a reasonable period <br />of time. <br />Attached is a copy of the cross section as built, referenced in <br />this letter for your information. Should you require more infor- <br />mation, please let me know. Thank you for your cooperation. <br />CYPRUS ORCHARD VALLEY COAL CORPORATION <br />vl~~ <br />Robert T. Johnson <br />Senior Mine Engineer <br />RTJ/cd <br />