Laserfiche WebLink
Colorado Department of Public Health and Environmwt <br />Air Pollution Control Division Page 4 of 6 <br />(` -MINING OPERATIONS - <br />I. PROCESSING <br />Will processing (i.e., cnushing, scorning, etc.) occur oa site? yes <br />C <br />Tons <br />Tons <br />J. CONVEYORS/TRANSFER POINTS <br />Tons of Material Conveyed Per Year <br />Tone Of Material Conveyed Per Day <br />Proposed Controls <br />^ Enclosum Type: <br />^ Other (specify) <br />Number Of Ttaosfer Points <br />Proposed Controls <br />^ Enclosure Type: <br />^ Water Spray <br />^ Chemical Stabilizer <br />^ Other (specify) <br />(Indicate On A Separate Disgrsm How Conveyor System L Set Up) <br />NOTE: ALL PROCESS EQUIPMENT REQUIRES A SEPARATE PERMIT APPLICATION AND <br />APEN. <br />PRIMARY CRUSHING <br />Maximum tons crushed per year. <br />Maximum tons crushed per hour. <br />Hours of crushing per day: <br />Proposed Controls: <br />^ Moist Material <br />^ Water Spray <br />^ Enclosure Type: <br />^ other (specify) <br />Tone <br />Tons <br />SECONDARY CRUSHING <br />Maximum tons crushed PC1 Y~ <br />Maximum tone crushed per hour. <br />Hours of crashing per day: <br />Proposed Controls: <br />D Moist Material <br />^ wat« spray <br />^ Enclosuuro Type: <br />D Other (specHy) <br />SCREENING/CLA 33IFYING <br />Maximum tons screened per year. 30,000 Tons <br />Maximum tons screened per hour. 100 Tons <br />Hours of scorning per day. 8 <br />Proposed Controls: <br />^ Moist Material <br />^ Water SPtaY <br />^ Enclosuro Type: <br />D other (specify) <br />RESCREENINGlCLASSIFYING <br />Maximum tons screened per year. <br />Maximum tons screened per hour. <br />Hours of screwing per day: <br />Proposed Conrols: <br />^ Moist Material <br />^ Water spray <br />^ Encloaum Type: <br />D Other (apeeltg) <br />NA Tons. <br />Tons. <br />Tons <br />Tons <br />(Complete or Partial) <br />(Complete or Partial) <br />Revised September 2004 htto://www.cdohe.state.co.us/ao/stationarv.html <br />