Laserfiche WebLink
Colorado Department of Public Health and Environment <br />Aa Pollution Control Division <br />-MINING OPERATIONS - <br />C-. <br />ESTIMATED EMISSIONS <br />Yesr For Which Actual Data Applies: <br /> <br /> <br />Pollutant Estimated Emissions <br />(tona~yr) at throughputs <br />re9ues~ <br /> <br />Ach~ai Emissions <br />From Data Year <br />Estimation <br />Method <br /> Controlled Uncontroued <br />Particulate <br />PM-10 <br />A. TOPSOIL REMOVAL <br />Maximum Tans Removed Per Day: NA <br />Tans Removed Per Year. <br />Proposed Controls Fot Topsoil Removal: <br />^ Moist Material <br />^ Water Spray <br />^ ocher (specify) <br />Page 2 of 6 <br />B. TOPSOIL STOCKPILE(S) <br />Maximum Stored At One Tinre: NA Tana <br />Proposed Controls For Topsoil Stockpile; <br />^ Watering TimeslDay <br />^ Chemical Stabilizer <br />^ Compacting Of Piles <br />^ Enclosures Typo: (Complete or Partial) <br />^ Rcvegetatian Revegetation Must Occur Within One Year Of Soil Disturba~e <br />^ Other (specify) <br />C. OVERBURDEN REMOVAL <br />Equipment Used For Removal: NA <br />Maximum Tone Removed Pet Day By Dragline: <br />Tons Removed Per Year By Dragline: <br />Number Of Scraper Hours Per Day: <br />Number Of Scraper Hours Per Year. <br />Proposal Controls For Overburden RemovaL• <br />^ Moist Material <br />^ Water Spray <br />^ Other (specify) <br />Revised September 2004 <br />