Laserfiche WebLink
.., <br />Predecisional Draft ~~.~2/28/94 <br />Kerr Coal Company - Marr Strip :,; ~-~ <br />Final Design .~ <br />~~..:~ <br />Utilizing the above criteria, the recommended final design and associated guidance are as <br />follows: <br />1. The ridge line shall be reestablished at the approximate location and elevation shown <br />on Figure 2, Reclamation Alternative. The attached hydrologic analysis establishes <br />that this location will meet the drainage requirements to provide adequate drainage <br />found in the approximate original contour provisions. <br />2. The ridge line shall be about 100 feet at the top, but may exhibit the rounded and <br />undulating configuration of the surrounding natural ridge tops. <br />3. It will be Kerr Coal Company's responsibility to develop an operating plan, timetable, <br />and engineering drawings to implement the above design concepts. These plans will <br />be approved by the State of Colorado, with the concurrence of OSM/WSC, before <br />implementation. <br />6 <br />