Laserfiche WebLink
<br /> <br />BRAY 2 7 R)~CD <br />RECEIUF~ <br />JUN 0 ~ 1997 <br />SETTLEMENT AGREEMENT <br />Cessation Order No.: <br />Notice of Violation No.: C-97-003 <br />Division of lvlulerais a ueau~; <br />Mine: Yoast Mine Permit No.: C-94-082 <br />Permittee: Seneca Coal Comoanv <br />Mailing Address: P.O. Drawer D <br />Havden, Colorado 81639 <br />Operator: (If other than Permittee): <br />Mailing Address: <br />County: <br />Type of Mine: Surface\Federal <br />The Division of Minerals and Geology ("the Division") issued a certain Notice of Proposed Amount <br />of Civil Penalty, and the operator requested a conference thereon, as authorized by C.R.S. 1973 <br />34-33-123(81. The requested conference having been held as required by law, on <br />Mav 20, 1997 ,the Division and the operator hereby agree as follows: <br />1. The amount of the penalty shall be S 1 ,350.00 , <br />2. The penalty shall be paid to the Division by the operator not later than 30 days <br />from the date this Agreement is signed by all parties; <br />3. Payment of such penalty by the operator shall constitute a waiver of all further <br />rights to review of such penalty or of the violation on which it is based. <br />This agreement shall not be effective unless signed by the operator within ten days after the <br />closing date of such conference, which date is set forth below opposite the signature of the <br />Conference Officer. If not so signed, the Division will fix the penalty at whatever amount it deems <br />appropriate based upon the factors referred to in C.R.S. 1973, 34-33-123(8)(dl. <br />DATE: <br />~ypy , gyp. X77 <br />DATE: Mav 21 , 1997 <br />Penalty Adjustment Reviewed <br />(Rule 5.04.3(411c11 <br />C.R.S. 34-33-123(81(c) and (dl <br />OPERATOR: SETIHA DAL I,OMPANY <br />By t~ ~~ <br />DIVISION OF MINERALS AND GEOLOGY: <br />B~s~~o~• g ~/~ ~.~ <br />onference Officer <br />By <br />Division Director <br />m: \coel\sh are\f orms\5016 <br />