Laserfiche WebLink
Dudash,Joe <br />Page 1 of 1 <br />From: Jim Stark [starks_5@yahoo.com] <br />Sent: Thursday, September 20, 2007 7:11 AM <br />To: Dudash, Joe; Stark, Jim <br />Subject: Bowie TR-49 <br />Attachments: 3962589038-Bowie No. 2 Mine Technical Revision 49 Summary Sheet.xls; 1807689999- <br />Bowie No. 2 Mine Technical Revision 49 Task 221 -Structural Demolition.xls <br />Joe, <br />Attached are the spreadsheets for the estimate for Bowie No. 2 Mine's Technical Revision 49. There is a <br />summary sheet and a demolition sheet. There is a credit of $29,861.00 for this estimate because Bowie <br />will not be condtructing the refuse bin and overland conveyor. <br />As I stated in my phone message yesterday, for BRL to receive this credit they must eliminate the text in <br />the PAP referring to the refuse bin and conveyor, eliminating the possibility that they can build it in the <br />future. Additionally, the minima10.1 acre disturbance will require no backfilling and grading that has <br />not already been estimated and bonded for. The additional road spur is in a level area and no real <br />earthwork is necessary. There is, however, a cost to remove the culverts, which is included in the <br />demolition task sheet. <br />Please let me know if you have any questions regazding this estimate. <br />Be a better Heartthrob. Get better relationship answers from someone who knows. <br />Yahoo! Answers -Check it out. <br />9/20/2007 <br />