My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV07715
DRMS
>
Back File Migration
>
Revision
>
REV07715
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 1:08:30 AM
Creation date
11/21/2007 9:45:40 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977170
IBM Index Class Name
Revision
Doc Date
8/26/1998
Doc Name
REQUIRED TWO WEEK PUBLICATION PERIOD BUTALA GRAVEL PIT M-77-170
From
DMG
To
LORETTA PINEDA
Type & Sequence
AM1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
iii iiiiiiiiiiiiiiii <br />999 <br /> STATE OF COLORADO <br />DIVISION OF MINERALS AND GEOLOGY <br />Dep, rtment of Natural Resources <br />131 7 Sherman SL, Room ?1 S i <br /> <br />Denver, Cobrario 80?03 l <br />~ <br /> <br />Phone: 13031 8561567 I <br />FA% 0031 8 3 2-8106 <br /> DEPARTMENT OF <br />NATURAL <br />August 26, 1998 RESOURCES <br />Roy Romcr <br />To: Loretta Pineda, H. Bruce Humphries, lames Stevens governor <br />I James 5. Lochheul <br />From: lames Dillie f„~ E.ecunve D~reaor <br />// v~. michael B. long <br />v Dwision Director <br />Re: Required two week publication period, Butala Gravel Pit, M-77-170 <br />1 am processing a permit amendment application which a few local citizens are objecting to. The <br />Division completed a technical review of the application and is now ready to recommend approval of the <br />amendment with one stipulation. <br />The operator is Butala Construction Co., the pit name is Butala Gravel pit, permit number M-77-170. <br />The site is located about 1 mile north of Salida in Chaffee Counry. The operator proposes to expand the <br />permit size from 22 acres to 84 acres. <br />The informal conference was held June 11, 1998 and the pre-hearing conference is scheduled for <br />September 10, 1998. The item will be presented to the Board during the September 23-24, 1998 <br />meeting. <br />As required by Rule 1.6.1(4), a notice must be published in a newspaper of general circulation once a <br />week for two consecutive weeks immeadiately prior to the hearing. Since the Board meets on September <br />23 and 24, the item needs to be published during the weeks of September 7th and 14th. <br />If you need anything else, let me know. <br />
The URL can be used to link to this page
Your browser does not support the video tag.