Laserfiche WebLink
<br /> <br />TES <br />ewcfrror+ <br />addressed in the Adequacy Review Response, Item #10 Exhibit G. <br />ROCKlOIIp <br />The other concern related to this was the impact on the groundwater in relationship to <br />South Platte fiver. We plan through our NPDES permit discharge locations to pump <br />inflowing water, into the pit directly back ir-to the river so there will be minimal if any <br />destabilization of the river bank. <br />I hope this information is sufficient to address the concerns of Urban Drainage and if <br />you have any other questions please let me know: <br />Sinc ly, <br />Bill Timmons <br />Vice President <br />Ready Mixed Concrete Company <br />cc: Chip Spratlen <br />Alan Howard <br /> <br />P.O. Bax 2290 <br />Denver, CO 80201 <br />(303) 659-0630 <br />