Laserfiche WebLink
<br />CIRCES Cost Estimating Software <br />SCRAPER -ONLY WORK <br />Agency or organization name : CO OMG <br />Task#: 00~(Q State: Colorado PertniVjob#:M-1976.056 <br />Dale' 71282000 Count' :Logan Abbreviafion :none <br />User: GRS Sile'Riversitle Prf Filename:M056005 <br />Permit or other job action AM-001 <br />Task description .Spread Topsail <br />HOURLY EpUIPMENT COST <br />Model : Caf 637E Senes 2 <br />Cost Breakdown : Job u tilization <br />Ownership cost/hour' 855.69 NA <br />Operating cesVhour: $70423 700 <br />Operator cosUhour: 523.30 NA <br />Total unit cosVhour : $783 22 Total flee[ cesVhour <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume: 23,580 BCY factor: 7230 volume <br />Source of quantity lake-o8 : EX L <br />Source of estimated Swell factor : NA <br />Shia bases' 7per tlay <br />Horsepower : 450 <br />Weight (UST) : 4f 44 <br />Cost tlata source : (C?G) <br />5183.22 <br />29.003 LCV <br />Hauling CapaaN' <br />Scraper Payload (weight) Basis : Scaper Bowl (volume) Basis <br />Malenal weight : 2,100 pounds/LCY SVUCk volume : 21.00 LCY <br />Material description : Heaped volume : 37 00 LCY <br />Earth -Loam Ave2ge volume : 16.00 LCY <br />Rated payload. 75,000 pounds <br />Payload capacity' 35 71 LCY Atl)usted capacity : 26.00 LCY "" <br /> <br />Cycle Time (loatl + haul + spread + return) : Loading Ume' 2.25 minutes' <br /> Maneuver and spreading Ume : 0 70 minutes <br />Travel lime : ' Ioatling time per part on pusnyuil models <br />Route Distance fleet) Grade (%) Roll. res (%) Total res.(%) Velocity (fpm) Travel ume (min ) <br />Haul. 500 0.0 4.0 4.0 1.670 050 minutes" <br />Return: 500 ~ 00 40 40 2,721 041 minutr:s" <br />"travel lima atllustetl for acceleration en0 deceleration el load antl tlump points <br /> Total gcle time : 3.86 minutr:s <br />Job Condition Comection Factors <br /> <br />Site altitude (feet) : 3.940 Adiusled Houdy Production , <br />Altitude adjustment factor: 1.00 (Cat HB) <br />Job efficiency factor . 0 B3 (1 shi7Vday) Unadlusted unit production : 404.21 LCY/Flour"' <br /> Adtusted unit production : 335 50 LCY/Flour <br />Netpb correction factor: 083 Adjustetl fleet produdan: 335.50 LCY/Flour <br /> "'?limes volume on push-pull models <br />JOB TIME AND COST <br />Fleet size. 7 Scraper(s) Total job time <br />Unit cost' 80546 /LCV Total job cost <br />86.45 Hours <br />E15,839 <br />