My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV07693
DRMS
>
Back File Migration
>
Revision
>
REV07693
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 1:08:29 AM
Creation date
11/21/2007 9:45:32 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1976056
IBM Index Class Name
Revision
Doc Date
11/28/2000
Doc Name
FAX COVER
From
DMG
To
ENVIRONMENT INC
Type & Sequence
AM1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />CIRCES Cost Estimating Software <br />COST SUMMARY FORM <br />PROJECT IDENTIFICATION <br />Date : 28-Nov-2000 Permit or job no.: M-1976-056 <br />User : GRS Abbreviation : none <br />Filename : M056-000 <br />Agency or organization name :CO DMG <br />Permit or job action :AM 001 <br />Site :Riverside Pit <br />State :Colorado <br />County:LOgan <br />TASK LIST (DIRECT COSTS) FORM FLEET TPSK DIRECT <br />NO. TASK DESCRIPTION USED SIZE HOURS COST <br />001 -Back(II Lake RobeR Slopes NA 5 178.00 $54,977 <br />002 -Back(IIAM001 Slopes NA 1 148.00 $17,036 <br />003 -Seed & Mulch Site NA 1 ?0.00 $12,952 <br />004 -Plant Site Ripping NA 1 6.50 $399 <br />005 -Seed bed prep-Grading NA 1 23.60 $1,457 <br />006 -Respread topsoil NA ~ 1 86.50 $15,839 <br />007 -Mob/DEmob ~ NA ~ 8 32.00 $4,000 <br />SUBTOTALS: :'04.60 $106,660 <br />inclutles inflation faMOr adjustment o!: NA % TOTAL DIRECT C~JST' _ $106,660 <br />INDIRECT COSTS <br />OVERHEAD AND PROFIT- Liability IRSUfanCe <br />Performance bond <br />Job superintendent <br />Profit <br />• not requrretl for eqp operator serves as superl <br />1.55 %ofdirect otal= $1,653 <br />1.05 % of direct total = $1,120 <br />NA' NA NA total = NA <br />10.00 %o/direct total= $10,666 <br />PROJECT MANAGEMENT- <br />Engineering work and/or contracUbid preparation <br />Reclamation management and/or administration <br />CONTINGENCY - <br />• contingencies accounted for of task level <br />TOTAL o s P = $13,439 <br />CONTRACT AMOUNT (tlin?d+08P)= $120,099 <br />4.25 %o(cntr. NA total= $5,104 <br />5.00 %o/cntr. NA total= $6,005 <br />NA' NA total = NA <br />TOTAL INDIRECT COST= $24,548 <br />TOTAL BOND AMOUNT (direct + indil•ect) _ $131,208 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.