Laserfiche WebLink
TRAPPER MINING INC. <br />SAND AND GRAVEL SITE <br />Table L-2. Production material and total reclamation costs by treatment, and <br />total reclamation cost. <br />Total Total Total <br />Production Material Reclmation <br />Area (1) Treatment Cost ($/acre) Cost ($/acre) Cost ($/acre) <br />A,B,C,D Regrade $ 1,409.76 $ - $ 1,409.76 <br />A Rip Surface 1,355.54 - 1,355.54 <br />A,C,D Topsoil Replacement 2,776.17 - 2,776.17 <br />A,C,D Drag topsoil 14.43 - 14.43 <br />A,C,D Fertilize topsoil 5.60 58.59 64.19 <br />A,C,D Disk topsoil 21.64 - 21.64 <br />A,C Harrow topsoil,(X2) 14.43 - 14.43 <br />A,C,D Drill perennials 12.87 240.00 252.87 <br />C Plant tree tubelings - 1.03 1.03 <br />A,C,D Weed Control 9.72 3.625 13.35 <br />(1) A - road areas <br />B - pond areas (permanent) <br />C - all other disturbed areas <br />D - silt basin <br />JMM/jb <br />12/85 <br />• • <br />