Laserfiche WebLink
<br />ATTACHMENT A <br />Photo Log <br />May, 1985 CYCC Mine No. 3 Inspection <br />5/85/D-l7 Middle Creek Detention Basin, 5-23-85 p.m. <br />5/85/D-18 Emergency Spillway Channel/Middle Creek Pond/Not flow and high <br /> water mark 5-23-85 p.m. <br />5/85/D-19 Middle Creek Pond emergency spillway. Middle Cree k in <br /> background 5-23-85 p.m. <br />5/85/D-20 Regraded gullies and fresh furrows on regraded Pit 3. 5-23-85 <br /> p.m. <br />5/85/D-21 Regraded gullies and fresh furrows on regraded Pit 3. 5-23-85 <br /> p.m. <br />5/85/E-1 Regraded Pit 3 5-23-85 p.m. <br />5/85/E-2 Regraded Pit 3 5-23-85 p.m. <br />5/85/E-3 Base of Pit 3 slope - view up spring fed gully in southern <br /> portion of Pit 3 area. 5-23-85 p.m. <br />5/85lE-4 Further up slope along same gully. 5-23-85 p.m. <br />5/85/E-5 Freshly constructed furrows and reclaimed gullies, Pit 3. <br /> 5-23-85 p.m. View is to the north along slope. <br />5/85/E-6 Middle segment spring fed gully. View to west. N ote flow in <br /> gully. 5-23-85 p.m. <br />5/85/E-7 Rilled area on Pit 3 slope. 5-23-85 p.m. <br />5/85/E-8 Rilled area on Pit 3 slope. 5-23-85 p.m. <br />5/85/E-9 Source of spring in drainage above Pit 3 reclaimed area. <br /> 5-23-85 p.m. <br />5/85/E-10 Upper segment spring fed gully on Pit 3 reclaimed area. <br /> 5-23-85 p.m. <br />5/85/E-11 Source of spring above Pit 3. 5-23-85 p.m. <br />5/85/E-12 Rill erosion and subsequently constructed furrows on Pit 3 <br /> reclamation. View from north end looking south. 5-23-85 p.m. <br />5/85/E-13 Base of topsoiled Pit 3 slope. 5-23-85 p.m. <br />5/85/E-14 Base of topsoiled Pit 3 slope. 5-23-85 p.m. <br />