My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ENFORCE20174
DRMS
>
Back File Migration
>
Enforcement
>
ENFORCE20174
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:24:26 PM
Creation date
11/21/2007 9:44:06 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1978052
IBM Index Class Name
Enforcement
Doc Date
8/8/2001
Doc Name
BULL SEEP MEETING MINUTES
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />10. Ben Urbonas recommended that if an alternative plan that was responsive to UDFCD's and <br />Ken McIntosh's concerns, as well as consistent with the future operation of the reservoirs by <br />Denver Water, could not be achieved by the group quickly, moving forward with <br />implementing the current Howe Pit reclamation plan would make the most sense. UFDCD <br />would want agroup-approved alternative plan to be let for bid by no later than December <br />2001. <br />11. ICON will refine Altemative 1 with more detail. <br />12. Denver Water will pursue the possibility of multiple spillways joining the ponds, similar to <br />ICON's Alternative 2. <br />13. The next meeting was scheduled for August 29th at 9:00 AM at the UDFCD. <br />14. It was requested that individuals with specific project priorities, or design goals, email them <br />to Bryan Kohlenberg (BWK@UDFCD.or~) within the next week. <br /> <br />--- END OF MEETING--- <br />To the best of my knowledge, these minutes are a factual account of the business conducted, the <br />discussions that took place, and the decisions that were reached at the subject meeting. Please <br />direct any exceptions to these minutes in writing to the undersigned within ten (10) days of the <br />issue date appearing herein. Failure to do so will constitute acceptance of these minutes as <br />statements of fact in which you concur. <br />Minutes prepared by: <br />Craig D. Jacobson, E.I.T. <br />ICON Engineering, Inc. <br />Date <br />CC: Attendees, <br />Barry Marrs, Brantner Ditch Company (bmarrs@aol.com) <br />C:\W INDOW S\TE MP\B~B maedng.tloc <br />
The URL can be used to link to this page
Your browser does not support the video tag.