My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV07492
DRMS
>
Back File Migration
>
Revision
>
REV07492
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 1:08:19 AM
Creation date
11/21/2007 9:43:22 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1991146
IBM Index Class Name
Revision
Doc Date
8/4/1999
Doc Name
ZMK GRAVEL PIT PN M-91-146 TR 3 APPROVAL
From
DMG
To
MONADNOCK MINERAL SERVICES
Type & Sequence
TR3
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RECLAMATION COST-SUMMARY cont'd sh• 4 of 4 <br />K. PORTAL/SHAFT SEALING <br />Task No.l Task Description I Cost (E) <br />________ I __________________________________________________ I ____________ <br />I I <br />I I <br />I 1 <br />I I <br />------------------------------------------------------------------------ <br />Subtotal (K): <br />L. DRILL HOLE/MONITORING WELL SEALING <br />Task No.l Task Description I Cost (E) <br />________ I __________________________________________________ I ____________ <br />I I <br />I I <br />I I <br />I I <br />Subtotal (L): <br />M. MISCELLANEOUS RECLAMATION TASKS <br />cask <br />_____ No.l Task Description <br />___I__________________________________ I <br />________________I_ Cost (E) <br />___________ <br /> <br />Sa I I <br />I DemolitiarL7 ispose of 5'x10'x 10' mass a E0.22/c,f.l <br />E110 <br />6a I Seeding Per attached worksheet I E1,474 <br /> I Fencing I <br />7a I Mob/Demob Per attached worksheet I E1, 024 <br /> Subtotal (M): E2,608 <br /> TOTAL DIRECT RECLAMATION COSTS (subtot als A through M): E3, 158 <br />II. I <br />_____ NDIRECT COSTS <br />______________________________________ <br />__________________ <br />___________ <br />_____ <br />A. ______________________________________ <br />CONTRACTOR'S OVERHEAD 8 PROFIT __________________ ___________ <br />Item No.l Item Description I Cost (E) <br />_ <br />__ <br />_ <br />_____ ___ I _________________________________ <br />1. I Public Liability Insurance.... ________________ I _ <br />1.850Y, of dir. I ____ <br />___ <br />E49 <br /> 2. I Contractor's Performance Bond 1.550% of dir. I E49 <br /> 3. I Contractor's Profit........... 10.00% of dir. I E316 <br /> 4. I Job Superintendent..Equi p. oper. serves as super.) <br />Subtotal (A ): E414 <br />TOTAL CONSTRUCTION CONTRACT AMOUNT (direct plus 0 $ P): E3,571 <br />B. DMG PROJECT ADMINISTRATION EKPENSES <br />Item No,l Item Description I cast (E) <br />________ I __________________________________________________ I __________ <br />1. I Minerals Program Adm S.OOY. of cnt r.l E179 <br />NET INDIRECT COST PERCENTAGE: 18.76% Subtotal (B): E179 <br />TOTAL INDIRECT RECLAMATION COSTS (subtotals A through B}: 5592 <br />TOTAL PERFORMANCE BOND AMOUNT (direct plus indirect costs): E3, 750 <br />
The URL can be used to link to this page
Your browser does not support the video tag.