My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ENFORCE20088
DRMS
>
Back File Migration
>
Enforcement
>
ENFORCE20088
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:24:22 PM
Creation date
11/21/2007 9:43:17 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981015
IBM Index Class Name
Enforcement
Doc Date
11/14/1989
Doc Name
NOV C-89-021
From
GREG LEWICKI AND ASSOCIATES
To
MLRD
Violation No.
CV1989021
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r, <br />III IIIIIIIIIIIIIIII~-p~ <br />999 <br />GREG LEWICKI AND ASSOCIATES <br />1645 Court Place <br />Surte 309 <br />Denver. Coloratlo 80202 <br />~303~629-9335 <br />November 13, 1989 <br />F~ECEIi/E~ <br />NOV 1~ 1989 <br />Randy Price <br />Mined Land Reclamation Division <br />1313 Sherman Street 2nd Floor <br />Denver, CO 80203 <br />MINED LAND <br />RECLAMATION DIVISION <br />Re NOV N0. C-89-021 <br />Dear Randy: <br />This letter is a request for extension to remedy the violation C- <br />89-021 concerning the ditches on the site which have resulted in <br />erosion. The extension is requested for the following reasons: <br />(1) The ditches have been designed for the 100 year 24 hour <br />runoff event. These designs will be submitted to the Division on <br />- November 20, 1989. It is preferred that the Division review these <br />designs prior to implementation. <br />(2) The work done at the south end of the coal stockpile is <br />completed. <br />(3) Certain portions of the ditches requested to be remedied will <br />be removed for final reclamation. <br />(4) The revised application will be submitted on November 20, <br />which includes all responses to the recent adequacy review. If <br />approval can be granted quickly, the work on final reclamation <br />will begin the very next day after approval. <br />(5) American Shield commits to performing the remaining remedial <br />measures on the violation at the very start of the final <br />reclamation process. If all goes according to schedule, the work <br />will be performed in December of this year. <br />(6) There is not a great chance of an erosion-causing storm at <br />this time of year on the site. <br />
The URL can be used to link to this page
Your browser does not support the video tag.