Laserfiche WebLink
-' Jt3 CCS - ~••__ T 7eSJ_~__Jn <br />.'_ _ __3s "^^~•••• yr:17_3C1s `~°~_: O'er 3L _9'. __::S _ s.,ec_i 0.^.. __.._:.:5 ___ __35s__'_:~_ <br />_, J_2_~___ ___- _~_en _. _~E ___3 _..d_ _.:e 7..blem .S .3sC_~°_~ ~. _.._ d3 to .'3_ _.._ ______ <br />RESOLUTION IN PROGRESS <br />1. The berms along the "Goat Trail" had not been reestablished nor had the gull: es <br />been repaired. The compliance date is still October 30, 1981. <br />PROBLEi? <cSOLViD <br />I. The operator should work in conjunction with the Division to develop a plan to <br />minimize erosion along the tdest Ridoe haul road at culvert C-1. This must be discussed <br />during the next inspection. <br />2. The spill containment plan was submitted to the Division. The plan should be <br />implemented as soon as possible. <br />J. The adequacy of the vulcanization of the conveyor belt should be checked when <br />snow is on the around. <br />