My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2005-01-10_REVISION - M1989084
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1989084
>
2005-01-10_REVISION - M1989084
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 2:14:42 PM
Creation date
11/21/2007 9:43:05 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1989084
IBM Index Class Name
Revision
Doc Date
1/10/2005
Doc Name
Reclamation Cost & Summary
From
DMG
To
File
Type & Sequence
SO1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />PROJECT IDENTIFICATION <br />Task # : 00 3 <br />Date : 01/10 2005 <br />User : LDO <br />Agency or organization name :DMG <br />Permit or other job action :Reclamation cost estimate Re SO-1 <br />Task description :Spread 1' topsoil over 23 acres <br />HOURLY EQUIPMENT COST <br />Basic machine :Cat D8R Series ll - 8U Horsepower : 310 <br />Blade type :Universal <br />Attachment no. 1 : ROPS Cab Shitt basis : 1 per day <br />Attachment no. 2 :3-shank ripper <br /> Data source : (CRG) <br /> Utilization <br />Cost Breakdown : Ownership cosUhour : $48.82 NA <br />Operating cosUhour : $66.09 100 <br />Ripper op. cosUhour : $0.00 0 <br />Operator cost/hour : $31.76 NA <br />Total unit cosUhour : $146.67 Total fleet cosUhour : $146.67 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume: 37,100 LCY factor : NA volume: 37,100 LCY <br /> <br />Source of estimated volume :Reclamation Plan <br />Source of estimated swell factor : NA <br />HOURLY PRODUCTION Job Condition Correction Factors Source <br /> Operator skill : 0.75 (avg.) <br />Average push distance : 250 feet Material wnsistency : 1.20 (Cat HB) <br />Unadjusted hourly production : 400.0 LCY/hr Dozing method : 1.00 (gen.) <br /> Visibility: 1.00 (avg.) <br />Material consistency description : Job efficiency : 0.83 (1 shift/day) <br />Loose stockpile Spoil pile : 0.70 ((nd-mt) <br /> Push gradient : 1.22 (Cat Hl3) <br />Average push gradient : 10.00 % (neg) Altitude : 1.00 (Cat HB) <br />Average site altitude : 7,800 feet Material weight : 1.44 (Cat HB) <br /> Blade type : 1.00 (S/SU/U) <br />Material weight : 1,600 Ibs/LCY Net correction : 0.92 <br />Weight description <br />Top Soil Adjusted unit production : 368.32 LCY/hr <br /> Adjusted fleet production : 368.32 LCY/hr <br />JOB TIME AND COST ~~~ ~~~~ ~~~~~ ~~~ ~~~ ~~~ ~~~ ~~~ ~~ <br />Fleet size : 1 Dozers) Total job time : 100.73 Hours <br />Unit cost : $0.398 /LCY Total job cost : $14, 774 <br />State :Colorado <br />County :Fremont <br />Site :Oak Creek Gravel Pit <br />PermiUjob# : M-1998-084 <br />Abbreviation :none <br />Filename : M084-002 <br />
The URL can be used to link to this page
Your browser does not support the video tag.