Laserfiche WebLink
S <br />SETTLEMENT AGREEMENT JUSTIFICATION <br />NOV C-93-13 <br />Notice oP Violation C-93-013 was issued on March 30, 1993 for <br />°Failure to display proper: a) mine identification signs, b) <br />surface disturbance perimeter markers and c) stream buffer <br />markers. <br />The operator did not contest the fact of the violation or the <br />proposed civil penalty other than to request a good faith <br />reduction. <br />Mr. Thompson stated that new signs were ordered on March 30. They <br />were installed on April 5, except for the perimeter markers. <br />They hired an outside consultant to survey the mine boundaries <br />and the perimeter markers were installed by April 27. The <br />abatement deadline was April 30. <br />I believe the operator abated the violation in a timely manner. <br />Although an outside consultant was hired to survey the <br />boundaries, I do not feel this was an extraordinary effort or the <br />shortest time possible. I am not proposing a good faith <br />reduction. <br />Settlement Agreement Penalty Proposed $550.00 <br />