My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV07356
DRMS
>
Back File Migration
>
Revision
>
REV07356
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 1:08:13 AM
Creation date
11/21/2007 9:42:15 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980003
IBM Index Class Name
Revision
Doc Date
12/11/1986
Doc Name
HAYDEN GULCH MINE FN C-80-003
From
COLOWYO COAL CO
To
MLRD
Type & Sequence
RN1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
- ~' <br />! ~ D tisc 11 t9as <br />COM A Y MINED ~Ni~~gION <br />~RODI~E~EpG RECi..AMA?ION C <br />December 9, 1986 <br />Ms. Catherine W. Begej <br />Colorado Mined Land Reclamation Division <br />423 Centennial Building <br />1313 Sherman Street <br />Denver, CO 80203 <br />HAYDEN-GULCH MINE. File No. C-80-003 <br />Dear Ms. Begej: <br />---p-i.~ <br />III IIIIIIIIIIIIIIII <br />5731 State Highway 13 <br />Meeker, Colorado 81641 <br />(303) 824.4451 <br />We have reviewed some of the Division's concerns addressed in our <br />December 1, 1986 telephone conversation and make the fo]lowing comments: <br />Loadout Facility <br />1. The downdip groundwater monitoring well will be re-established <br />prior to the next sampling period. <br />2. The amount of coal left at the loadout is irrelevant to the <br />continued maintenance of the sediment control system. Ultimately, <br />the coal will be sold or leveled and compacted. <br />Minecita <br />1. We feel the extent of rip-rap on ditch 3 is suitable, as it is <br />located at the confluence of the major sub-drainages. Yampa <br />Mining informs us that the calculations do not indicate a need <br />for further rip-rap in areas above the present limit of rip-rap. <br />2. Yampa Mining has, to our satisfaction, established drainage <br />benches and ripped on the contour those areas of concern that were <br />drill seeded vertically. <br />3. Any work not completed on the western ditch will be completed <br />next year, according to the approved plan, when weather and soil <br />conditions allow the work to be completed. <br />
The URL can be used to link to this page
Your browser does not support the video tag.