My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2006-01-27_REVISION - M1977342
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977342
>
2006-01-27_REVISION - M1977342
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 6:21:15 PM
Creation date
11/21/2007 9:41:59 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977342
IBM Index Class Name
Revision
Doc Date
1/27/2006
Doc Name
Engineer of Record Cert. for Millwater Barge Sys.
From
Climax Molybdenum Company
To
DMG
Type & Sequence
TR4
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I ~ W. W. Wheeler and Assoc., Inc. <br />Water Resources Engineers <br />January 23, 2006 <br />Mr. Tim Haynes <br />Climax Molybdenum Company, Henderson Mill <br />19302 County Road 3 <br />Parshall, CO 80468 <br />Re: #1333.15 Henderson Pump Barge <br />Dear Tim: <br />The Millwater Barge System that has recently been constructed at the Henderson <br />Mill consists primarily of a floating pump barge and a discharge pipeline that conveys <br />process water from the tailing pond to East Branch Reservoir. W. W. Wheeler and <br />Associates, Inc. and its sub-consultants performed the design of the pipeline, power <br />distribution line, and land based civil and electrical facilities associated with the pumping <br />system. The barge itself was designed and fabricated by Chamco Industries in <br />accordance with a performance specification and supplied as a complete assembly. <br />Construction of the Henderson Millwater Barge System is virtually complete and the start- <br />up, testing, and de-bugging process is set to begin. <br />The purpose of this letter is to state that the system has been constructed in <br />general conformance to the design plans and specifications. This statement is based in <br />part on information that has been provided by others. As with any project, there were <br />several clarifications, modifications, and adjustments to the design that were made during <br />the fabrication and construction process. However, these modifications did not change the <br />purpose or intent of the original design. <br />The start-up and testing process should identify any operational problems or <br />issues associated with the system. We recommend that the existing decant pump system <br />not be abandoned until it is proven that the barge pumping system is operating properly. <br />37110 South Inca Street Englewood, Cnloradc 66110 Phnne (303) 761-4130 Fax (303) 761-282 <br />
The URL can be used to link to this page
Your browser does not support the video tag.