Laserfiche WebLink
Technical Revision No. 64 <br />Permit No. C-80-007 <br />Stipulation No. 49 <br />MOUNTAIN COAL COMPANY MUST ADDRESS THE DIVISION'S ASSERTION THAT A <br />TOPSOIL DEFICIT FOR FINAL RECLAMATION EXISTS. IF THERE IS A DEFICIT, <br />MCC MUST PROVIDE A DETAILED PLAN WHICH SPECIFIES HOW THE DEFICIT WILL <br />BE ACCOMODATED. IF SUBSOIL IS DESIGNATED AS A SUITABLE GROWTH MEDIUM, <br />THEN THE PERMIT SHOULD BE REVISED TO SPECIFY HOW MUCH SUBSOIL WILL BE <br />UTILIZED, WHERE IT WILL BE STORED, AND HOW IT WILL BE PROTECTED. A <br />REVISION ADDRESSING THE ABOVE SHOULD BE SUBMITTED TO THE DIVISION ON OR <br />BEFORE OCTOBER 29. 1993. <br />5407G <br />