My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV07260
DRMS
>
Back File Migration
>
Revision
>
REV07260
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 1:08:09 AM
Creation date
11/21/2007 9:41:06 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980007
IBM Index Class Name
Revision
Doc Date
10/19/1995
Doc Name
WEST ELK MINE PN C-80-007 MR 169 PARKING LOT EXTENSION
From
MTN COAL CO
To
DMG
Type & Sequence
MR169
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Mountain Coal Company <br />West Elk Mine <br />Post Office Box 591 <br />Somerset, Colorado B1aaa <br />Teleptwre 970 929-5015 <br />Fex 970 929-5595 <br />October 16, 1995 <br />Ms. Christine E. Johnston <br />° D <br />/0-~6.9s <br />R~~;FI~/ED <br />OCT 1 g 1995 <br />DIVISION OF MINERALS AND GEOLOGY Division of Mmerais ~ Ueoloyy <br />O6'ice of Mined Land Reclamation <br />1313 Sherman Street, Room 215 <br />Denver, CO 80203 <br />Re: West Elk P.~~ne, Permit Nc. C-80-007, Minor Revision No. 169, Parking Lot Extension <br />Deaz Christine: <br />III IIIIIIIIIIIIIIII <br />999 <br />/\ <br />Mountain Coal Company (MCC) requests Minor Revision No. 168 to extend the office/bathhouse parking lot <br />approximately I S feet to the south (bY 290 feet long) and approximately 80 Ceet to the east (bY 110 feet wide), <br />adding approximately 80 new parking spaces. Surface drainage will be to the south into ditch Dl-2 to be relocated <br />to the new south edge of the parking lot. A french drain will also be reinstalled in this area. <br />Both the parking lot and the ditch will be atrfaced with approximately three inches of 3/4-inch gravel this fall. <br />Approximately nine inches of 1.5-inch roadbase will be placed as the parking lot base. As weather permits next <br />spring, the parking lot will beasphalt-paved and the ditch will be shotcreted. <br />Approximately six-inches (or all available) topsoil will be salvaged (approximately 250 yards) and placed in the <br />topsoil pile on the lower refuse pile bench. As the weather and project schedule overlap allow, MCC may try to <br />live-haul a few shrub clttmps to the west side of the lower refuse pile, currently being covered with topsoil. <br />Approximately 1,750 cubic yards of subsoil will be cut and placed in the Sylvester Gulch stockpile to achieve the <br />designed parking lot and ditch grades. <br />MCC would appreciate the Division's assistance in estimating a reasonable reclamation bond for the additional <br />parking lot surfacing (1,460 square yards) and four light poles (2 of 4 existing poles to be relocated). Pavement <br />and gravel will be buried on site at final reclamation. Should you require further information for this task, please <br />contact me as soon as possible. <br />Please contact me should you have questions. <br />Sincere~i~/ "~~i~/ <br />Kathleen G. Well, <br />Environmental Supervisor <br />ce: Henry l3arbe <br />Michael Burke <br />Larry Kline, OSM <br />Phil Schmidt <br />
The URL can be used to link to this page
Your browser does not support the video tag.