My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV07219
DRMS
>
Back File Migration
>
Revision
>
REV07219
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 1:08:07 AM
Creation date
11/21/2007 9:40:47 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083
IBM Index Class Name
Revision
Doc Date
4/20/2000
Doc Name
FAX COVER BOWIE NO 2 MINE SHAFT REPORT PN C-96-083
From
JE STOVER & ASSOCIATES
To
JOE DUDASH
Type & Sequence
TR12
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
From: Jim Stover To: Joe Dudash Date: 4/28100 Time: 4:26:56 PM <br />J. E. STOVER & ASSOCIATES <br />2768 COMPASS DRIVE, SUITE 101 <br />GRAND JUNCTION, COLORADO 81506 <br />PHONE: (970) 245101, FAX 242-7908 <br />MINE ENGINEERING <br />MINE RECLAMATION <br />~Ga'~~v ~G' °~G~J~ ~~~G°a~ <br />• To: Joe Dudash <br />From: Jim Stover <br />Date: April 28, 2000 -Revision #1 <br />Fax #: 832-8106 <br />Page: 1 of 1 <br />Subject: Bowie No. 2 Mine <br />Shaft Report <br />Permit C-96-083 <br />III IIIIIIIIIIIII III <br />CML ENGINEERING <br />CONST. MANAGEMENT <br />Message: BRL made the following commitment during the approval of TR-12 <br />BRL will fax the DMG weekly progress reports during the <br />construction of the vent shaft and report if excessive flows are <br />encountered. The DMG will be notified of any decision by BRL <br />to grout any portion of the formation(s) below a depth of 140-feet. <br />The pilot hole is complete as of this date. As expected from prior drilling, a <br />small quantity of water was encountered at a depth of 53-feet and again at 67- <br />feet. The total inflow to the pilot hole is just a few gallons per minute. <br />The raise bore is scheduled to begin Wednesday May 3rd. It should be <br />complete within a week. <br />v <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.