Laserfiche WebLink
EXHIBIT L <br />RE~LAMAT/ON COSTS <br />RECLAMATION COSTS (coot) <br />1. Revegetation, 27.82 ac @ $500.00/ac $ 13,910.00 <br />2. Resoiling, 14,960 yd3 x $0.405/yd3 6,052.93 <br />3. Slope Backfilling, 40,800 yd3 x $0.405/yd3 16,506.89 <br />4. Sloping using cut/fill method <br />8,694 yd3 * 1.23 x $0.17/yd3 1,846.20 <br />5. Seed bed grading and backfill slope shaping <br />16,133.00 yd3 x $0.17/yd3 2,785.28 <br />6. Secondary Seeding 27.82 ac @308 x <br />$500.00/ac 4,173.00 <br />Net Total $45,274.30 <br />5. Indirect costs <br />Mobilization 1,905.67 <br />Insurance, Bond, & Profit 5,670.60 <br />6. Administration costs 4,527.43 <br />TOTAL ESTIMATE $57,378.00 <br />RECOMMEND BOND BE SET AT 557,400.00 <br />20 <br />