Laserfiche WebLink
RIDER TO MINING PERMIT <br />Permit Date: July O5, 1988 <br />Permit No: C-80-004 <br />The following additional stipulations and conditions form an integral part of <br />the foregoing permit: <br />STIPULATION !!O. 1 <br />IF, DURING THE COURSE OF OPERATIONS, PREVIOUSLY UNIDENTIFIED CULTURAL <br />RESOURCES ARE DISCOVERED, THE APPLICANT SHALL INSURE THAT THE SITE IS NOT <br />DISTURBED AND SHALL NOTIFY THE REGULATORY AUTHORITY. THE APPLICANT SHALL <br />INSURE THAT THE RESOURCE(S) IS PROPERLY EVALUATED IN TERMS OF THE NATIONAL <br />REGISTER OF HISTORIC PLACES ELIGIBILITY CRITERIA (36 CFR 60.6). SHOULD A <br />RESOURCE BE DETERMINED ELIGIBILE FOR LISTING IN CONSULTATION WITH THE <br />REGULATORY AUTHORITY AND THE SHPO, THE APPLICANT SHALL CONFER WITH AND OBTAIN <br />THE APPROVAL OF THE REGULATORY AUTHORITY AND THE SHPO CONCERNING THE <br />DEVELOPMENT AND IMPLEMENTATION OF MITIGATION MEASURES AS APPROPRIATE. IF <br />PREVIOUSLY UNPLANNED SURFACE DISTURBING ACTIVITIES ARE NECESSARY, THE <br />APPLICANT SHALL SUBMIT A JUSTIFICATION AND MAPS SHOWING THE PROPOSED <br />DISTURBANCE TO THE REGULATORY AUTHORITY FOR APPROVAL PRIOR TO THE COMMENCEMENT <br />OF THESE ACTIVITIES. <br />STIPULATION N0. 2 <br />A. FLOW MEASUREMENTS MUST BE TAKEN AT SURFACE WATER MONITORING SITE SW-2 AND <br />WATER SAMPLES SHALL BE TAKEN FROM SITES SW-2 AND SW-5 ON McCLANF CANYON TWICE <br />A YEAP. (AT DIFFERENT TIMES OF THE YEAR) AS FOLLOWS: <br />i) ONCE DURING SPRING SNOWMELT <br />ii) ONCE DURING A STORM EVENT <br />B. FLOW MEASUREMENTS MUST BE TAKEN QUARTERLY FROM SITE SW-1 AND WATER <br />SAMPLES MUST BE TAKEN QUARTERLY FROM SITES SW-1 AJJD SW-8. <br />C. THE WATER SAMPLES MUST BE CHEMICALLY ANALYZED FOR THE PARAMETERS <br />SPECIFIED BELOW: <br />pH <br />Specific Conductance <br />Temperature (field) <br />Total Suspended Solids <br />Total Dissolved Solids <br />Total Combustible Solids <br />Total Hardness <br />Sodium Adsorption <br />Ratio <br />Bicarbonate (HC03) <br />Calcium (Ca+2) <br />Magnesium (Mg+2) <br />Sodium(na+) <br />Sulfate (S04) <br />Aluminum (A1) <br />Arsenic (As <br />Boron (B) <br />Cadmium (Cd) <br />Copper (Cu) <br />Iron (Fe) <br />Lead (Pb) <br />Manganese (Mn) <br />Mercury (Hg) <br />lJolydenum (Mo) <br />Selenium (Se) <br />Zinc (Zn) <br />D. THE RESULTS OF ALL MONITORING MUST BE SUBMITTED TO THE DIVISION <br />IMMEDIATELY AFTER DATA COLLECTION AND ANALYSIS. <br />