My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV07092
DRMS
>
Back File Migration
>
Revision
>
REV07092
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 1:08:01 AM
Creation date
11/21/2007 9:39:45 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980007
IBM Index Class Name
Revision
Doc Date
4/29/1997
Doc Name
WEST ELK MINE C-80-007
From
DMG
To
MIKE BOULAY
Type & Sequence
PR7
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Colorado Division of <br />_____________________ Minerals and Geology <br />__ <br />____ <br />___ <br />__ <br />ESTIMATING FORM - _ <br />____ <br />____ <br />BULLD02ER WORK <br />Task q: 22R Prep. by: SLB Task File Name: C007-228 <br />____________ ________ <br />Dale: 09/28/97 Pe rm i[ p:C-BO-007 <br />_ _ <br />Mine: Wes[ Elk ____________ <br />Mine _ <br />___ <br />________ _________ __________ <br />Permit Action: Permit Revision No. 7 ____________ ___________ <br />_________________ <br />Task Description: Regrade ventilati <br />_________________ _____________________ <br />on shaft site <br />_____________________ ____________ <br /> <br />____________ ___________ <br /> <br />___________ <br />HOURLY EQUIPMENT COST <br />___________~________= Basic Machine: Cat D6N Horsepower: 285 <br />Blade Type: SEMI-UNIVERSAL ------____ <br />At tachmen[ kl: ROPS Cab Shift Basis: 1/day <br />A[[a chmen[ b2: N/A ---------- <br />Cost Breakdown: <br />-------------- Utilization t <br />Ovne rship cost/hr = 540.05 N/A <br />Operating fi overhaul cost/hr- dozer = 551.67 100 <br />-ripper = 50.00 N/A <br />Operator cost/hr = 522.95 N/A <br />Total egpt. unit cost/hr = $119.67 Total f <br />________ leet cost/hr : 5114.67 <br />________ <br />MATERIAL QUANTITIES <br />Initial = Swell Loose <br />Volume: 60,000.0 CCY FdCCOI: 1.165 Volume: 69,900.0 LCY <br />____________ <br />Source of quantity take-off: Table 2 <br />__ <br />____ __________ <br />of Exh. 69 <br />_________ <br />__ <br />______ _____________ <br /> <br />_____________ <br /> <br />__________ <br />__ <br />SOUYCC Of e9t. 9wC11 fdCtOl: DrV16 iOn ___ <br />_ <br />e9[imaCe, 50} rOCk - 50} d3 rC <br />_ <br />HOURLY PRODUCTION <br />~_______________= Job Condi[i on Correc tion Factors <br />Avg. push distance: 300 ft. -------------------- ------------ <br />--------- Operator.......... 0.75 (a vq.) <br />Unadjusted hourly Ma[. cons ie[ency.. 0.90 (Cat tbll <br />dozer production: 299 LCY/hr Dozing method..... 1.00 (gen.) <br />--------- Visibility........ 1.00 (avg.) <br />Material consistency: Job efficiency.... 0.83 (lsh/dayl <br />Compacted fill or embankment Spoil pile factor. 0.'10 Ifnd-mf) <br />------------------------------------- Push gradient..... 0.90 (Cat tbll <br />Avg. push gradient: 5.00 } Ipos) Altitude deta[ion. 1.00 ICa[ tbl) <br />--------- Material weight... 0.79 (Cat tDl) <br />Avg. site altitude: 7000 f[. <br />_________ Blade type........ <br />____________________ 1.00 <br />____________ IS,SU, U) <br />Material weigh[ 2900.00 lb/LCY Net Job Correction 0.28 <br />Mat. Descr.: _________ ___________ <br />Decomposed rock - EOt Rock, 50} Earth Adz used Unit Prod.: 83.95 LCY/hr <br />_____________________________________ <br />Adjusted Fleet Production: ___________ <br />83.95 <br />LCY/hr <br />JOB COST ----------- <br />Flee[ size 1 Dozer (s) Total Job Time: 832.64 Hours <br />________ <br />Unit Cost 51.]66 /LCY <br />Total Sob Cos[: ___________ <br />595,474.37 <br />
The URL can be used to link to this page
Your browser does not support the video tag.